|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m |
| 2 | Dismantling Stone Masonry Rubble stone masonry in cement mortar |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). |
| 4 | Centring and shuttering with plywood or steel sheet upto two storiesor height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for :Walls (any thickness) including attached pilasters, buttresses, plinthand string courses etc. |
| 5 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery. 300 mm internal diameter |
| 6 | P & L cement concrete including curing & compaction etc. Comp using aggregate 20 mm. Nominal size in foundation & plinth, excluding the cost of suturing using mix 1: 4: 8 |
| 7 | Centring and shuttering upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc |
| 8 | Supplying and fixing rough dressed stone sills, dassa, coping, cornices sriwan, string courses etc. in cement mortar 1:4 including pointing with admixture of pigment matching with the stone shade : 50 mm thick. (pwd bsr 2013) |
| 9 | Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto two stories, excluding the cost of centring, shuttering 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 10 | Brick masonary in foundation and plinth with bricks of class designation 75 m. M. IS 2212-1991 in : cement mortar 1:6 (1-cement : 6-coarse sand ). |
| 11 | Half brick masonry with bricks of class designation 75 in superstructure above plinth level upto two stories. Cement mortar 1:4 (1 cement :4 coarse sand) |
| 12 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 13 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix: 1:4 (1 cement : 4 fine/ coarse sand) |
| 14 | Constructing brick masonry road gully chamber 50x45x60 cm with bricks of class designation 75 in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm precast R.C.C. horizontal grating with frame complete as per standard design : With bricks Please Enable Macros to View BoQ information |