| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Lime Concrete, cement concrete grade M-10 (1:5:10) and below |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth 2 Km |
| 3 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Grading - III Material |
| 4 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 5 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 6 | Filling of Pot- holes and patch repairs with open graded premix surfacing 20mm thick compacted with bitumen binder VG-grade 30 @ 14.60 kg/10 sqm and aggregate in Hot mix plant, transporting the mixed material with tipper and laying manually to the required level and grade, rolling with power roller, 8-10 tonne, removal of all failedmaterial, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface complete as per clause 3004.2 of MoRT&H specification including allmaterial, labour, machinery, lighting, guarding and maintenance of diversion. |
| 7 | Providing and laying premixed seal coat using hot mix plant and paver finisher with aggregate of 6.7mm size defined as 100% passing through 11.20mm sieve and retain on 2.36mm sieve with 0.09 cum per 10 sqm premix with bitumen binder @ 4.5% and rolling with power roller 8-10 tonne complete as per clause 513 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. With Bitumen VG-grade 30 Please Enable Macros to View BoQ information |