| 1 | PART-C SCHEDULE ITEM |
| 2 | Providing and Fixing of Satute which is show in drawing and instruction by Engineer of Incharge and Prepare of statute with FRC and Marble as per engineer instruction. Statue of Fateh Singh JI in Stone which is mentioned in drawing and also provide sculpture as per drawing mention.Size of Elephant L-0.750m, W-0.8m and H-.750m. |
| 3 | PART-A CIVIL ITEM |
| 4 | Dismantling Stone Masonry.Rubble stone masonry in cement mortar. |
| 5 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer.Bituminous courses |
| 6 | Removing & re-fixing of precast cement concrete interlocking paving blocks of all sizes over 50 mm thick course sand bedding (duly compacted) including filling of joints with sand complete in all respect. |
| 7 | Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately as per MoRT&H specification clause 202 |
| 8 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit to required compaction as per MoRT&H specification clause 201. (Measurement of girth to be done at height of 1 m above ground level) Girth from 1800 mm to 2700 mm |
| 9 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m |
| 10 | In ordinary rock. Depth of excavation above 1.5 m and upto 3.0m |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 12 | Random rubble dry stone Kharanja (soling) under floor. |
| 13 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 14 | Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories. Cement mortar 1:4 (1 cement :4 coarse sand) |
| 15 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 16 | Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. |
| 17 | Cement plastering including T&P, scaffolding, material and completelabpour, including cost of water, curing, racking ofjoints etc.with12mm cement plaster of mix : 1:6 (1 cement : 6 fine/ coarse sand) |
| 18 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
| 19 | Providing and fixing on wall face Unplasticised Rigid PVC Single socketed pipes rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. 110 mm diameter |
| 20 | Providing and fixing on wall face Unplasticised - PVC moulded fittings/ accessories for Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. 110 mm diameter |
| 21 | Steel work welded in built up sections/ framed work including cutting,hoisting, fixing in position and applying a priming coat of approvedsteel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 22 | Flooring with Cobble stone of approx. Size 125x125x75 mm (thick) laid on 25 mm average thick cement mortar 1:3 ( 1 cement : 3 Coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the stone, laid in approved pattern complete in all respect as per direction of Engineer-in-charge. |
| 23 | Providing and fixing precast cement concrete M-20 grade (Using mechanical Concrete Mixer) kerb stone top and bottom width 115 and 165 mm respectively, 250 mm high on 150 mm thick PCC M-10 grade foundation as per design, including fixing at site as per clause 408 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 24 | Providing and fixing Granite stone slab mirror polished and machine edge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc. laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete. Jhunjhunu / Jalore (Red / Chocolate Colour).1501 Cm2 to 3600 Cm2 Tiles |
| 25 | Extra for providing edge moulding to 15-18mm thick marble/ Granite stone counters, Vanities etc. including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge. Granite Work at Statue |
| 26 | PART-B HOTRICULTURE ITEM |
| 27 | Supply at site of work well decayed farm yard manure, from any available source, approved by the engineer in-charge including screening and stacking. |
| 28 | Planting Flowering Plants and Shrubs in Central Verge.by instruction of Engineer Encharge |
| 29 | Maintenance of Flowering Plants and Shrubs in Central Verge forone Year. |
| 30 | Supply and planting following species best quality container grown healthy trees of 2 mt. min. height, well established & free from disease at site in 0.90 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the hole watering etc as required.Plumeria alba ( Champa) |
| 31 | Supplying and stacking good earth at site of work. Note: 1) Loading, unloading and carriage to be paid extra as per actual lead. 2) Earth measured in stacks will be reduced by 20% foe payment |
| 32 | Grassing with \"Doobs\" grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed. (The good earth shall be paid separately) In rows 30 cm apart in either direction Please Enable Macros to View BoQ information |