| 1 | M&L comprehensive maintenance of4 loops addressbale fire alarm system installed at NEW OPD COMPLEX under Base hospital through OEM (Honeywell) during the period of contract with complete testing of Fire alarm Panel , Manual Call Points Wall sounder, buzzer, receiving panel , smoke detector and other connected items complete in all aspect in presence of Engr-in-Charge and New OPD Rep to their complete satisfaction.Note :-All work shall be carried out only by authorised Rep of OEM and using all genuine spare parts supplied by OEM only, in this regard an MOU between OEM i.e M/S Honeywell and the Contractor must be perform ,A copy of the same MOU shall be uploaded with the tender document .(i) Preventive maintenance of all systems on monthly basis and upkeep of log book.(ii) Attending all complaints within 24 working hours intimated by Engr-in-Charge.(iii) Field service report shall be maintained and submitted to the Engr-in-Charge after expiry of every month and before submission of RAR .(iv) The rates quoted by the contractor shall deemed to be inclusive of necessary T&P etc(v) Major Spares Part(like Control Panel, Smoke Sensor, MCP) that need to be replace shall be measured and paid separately under respective item of this schedule.(vi)A damage of Rs 500.00 per complaint per day shall be imposed on contractor, if the complaint shall not attended within 24 Hours of complaint intimated byEngr-in-Charge.(vii) Contractor also displays his contact number near Fire Alarm Panel and complaint shall be attended immediately within time frame given in particular specification. (viii)Every month Technician shall check serviceability of Fire detection system and serviceability report of Fire Alarm system shall be submitted by the contractor. |
| 2 | M&L for Calibration of the fire alarm control panel with necessary program, including functionality testing, accuracy testing, compliance testing, battery testing to ensure proper functioning of smoke detector with accurate detection of smoke complete in all aspect all as specified and directed. |
| 3 | Supply , Installation , Testing & Commissioning in replacement Addressble Smoke Detector compatible with analogue Addressable Protocol, having removable high performance chamber with Twin fire LED\"s allow 360 degree viewing, User selectable sensitivity modes 1% to 4.5% obs/m, Incorporate Optical elements,lock mechanism (sensor to base), Electronically addressed, Pulsing/ Non-Pulshing Controlled from panel complete all as specified and directed. |
| 4 | Supply & Fix in replacement of weatherproof analogue Manual Call point with Integral short circuit Isolator.The call point shall have fast response , Integral short-circuit isolator,Bi-coloured status LED ,Non Frangible element fitted as standerd, surface mounted ,IP67 rated complete all as specified and directed. |
| 5 | Supply & Fix in replacement of Output Relay Module MI/DCMOE complete all as specified and directed. |
| 6 | Supply & Fix in replacement of Intelligent loop powered wall sounder which provide a range of tones and volumes with a maximum output of upto 102 db with low current consumption, 51 user selectable tones complete all as specified and directed. |
| 7 | Supply & Fix in MS enclosure for MCP with all accessories required all as specified and as directed. |
| 8 | Supply & Fix in replacementMCP glass complete in all aspect all as specified and as directed. |
| 9 | Supply & Fix in Fire Alarm Panel Battery of 12V , 7Ah complete in all aspect all as specified and as directed. |
| 10 | M&L for comprehensive maintenance and repair including replacement of defective parts/fittings including all electronics and electrical spares required for comprehensive maintenance during the entire contract period through AMC of 30 KVA Online UPS System (details mentioned below in NOTE:-1) (Make-VERTIV) installed at various wards/area under base hospital during the period of contract every month. NOTE -11.Dental Deptt. -01 No2.Dialysis Dept.- 01 No.3.New OPD- 01 No.4.Dialysis- 01 No5.GE Center- 01 No6.OT Complex- 01 No7. Open Heart Plant - 01 No8. Trauma Center -01 No9.Labour Room- 01 No10. Covid ICU- 01 No11. Eye OT - 01 No12.ICU- 01 No |
| 11 | Note - 2(i) All work shall be carried out only by authorised Rep of OEM and using all genuine spare parts supplied by OEM only, in this regard an MOU between OEM i.e M/S VERTIV and the Contractor must be perform ,A copy of the same MOU shall be uploaded with the tender document in cover - 1 (Tech Bid).(ii) Contractor should be responsible of proper functioning of all the machine.(iii) Batteries for the UPS if required shall be paid sepretaly in respective schedule.(ii) Contractor through OEM shall be responsible for repair and replacement of all defective parts of the equipment as per OEM recommendation during entire comprehensive maintenance period.(iii) Preventive maintenance of all systems on monthly basis and upkeep of log book.(iv) Attending all complaints within 24 working hours intimated by Engr-in-Charge.(v) Field service report shall be maintained and submitted to the Engr-in-charge after expiry of every month and before submission of RAR .(vi) The rates quoted by the contractor shall deemed to be inclusive of necessary T&P etc(vii)A damage of Rs 500.00 per complaint per day shall be imposed on contractor, if the complaint shall not attended within 24 Hours of complaint intimated byEngr-in-Charge.(viii) Contractor also displays his contact number near UPS System and complaint shall be attended immediately within time frame given in particular specification. (ix)Every month Technician shall check serviceability of UPS and serviceability report ofsystem shall be submitted by the contractor. |
| 12 | Supply and Fix in replacement vertiv make power module and MMB suitable for exising 30 KVA 3 phase online UPS complete in all aspect as per description mentioned below all as specified and as directed.1.Hot-Swappable Inverter/Rectifier Power Module for 3-Phase True Online Double Conversion UPS System, incorporating IGBT-based Rectifier (PFC) and Inverter stages including faulty power component board of genuine make of OEM including the main logic control PCB or display/monitoring card, aged DC Bus and AC Filter Capacitors, faulty fan module ,main I/O and battery node ensuring proper thermal management and insulation with inter-cell connectors, terminal caps, and necessary DC power cabling between the battery bank and the UPS and comprehensive functional testing of the repaired UPS system under simulated or actual load to verify stable operation, battery discharge/charge performance, and seamless transfer (Static Switch) complete.2.Manual Maintenance Bypass (MMB) Switchgear/Board, designed to provide break-before-make switching for isolating the main UPS unit without interrupting power to the critical load, facilitating safe maintenance and specifically designed or certified for use with 30 KVA, Three-Phase (3:3) Vertiv make Uninterruptible Power Supply (UPS) systems to match the Input /Output of UPS system, typically 400/415V AC, 3 Phase, 4 Wire + Earth incorporated high-quality, rated switchgear for UPS Bypass, UPS Output, and Maintenance Bypass operation ensuring current rating to be suitable for 30 KVA load (approx. 43A per phase at 400V, with margin) complete |
| 13 | Dismanling all connection,Repair, Refixing, configuration, and testing of the internal communication Hot-Swappable Inverter/Rectifier Power Module for 3-Phase True Online Double Conversion UPS System for a 30 KVA Vertiv make UPS , including troubleshooting of communication ports, firmware update, replacement of faulty networking components, and verification of remote monitoring alerts/LIFE Services integration to ensure seamless data transmission to the UPS complete in all aspect all as specified and as directed. |
| 14 | Dismanling all connection,Repair, Refixing, configuration, and testing of the Manual Maintenance Bypass (MMB) Switchgear/Board, designed to provide break-before-make switching for isolating the main UPS unit without interrupting power to the critical load for 3-Phase True Online Double Conversion UPS System for a 30 KVA Vertiv make UPS , including troubleshooting of communication ports, firmware update, replacement of faulty networking components, and verification of remote monitoring alerts/LIFE Services integration to ensure seamless data transmission to the UPS complete in all aspect all as specified and as directed. |
| 15 | Supply & fixing in Replacement Sealed Maintenance Free 12V/65AH Batteries with suitable sizeterminal link for 30 KVA UPS. (Make:Exide/Amaron/V-Guard) |
| 16 | Supply & fixing in Replacement bussmann series 160 amp BS88-4 HRC fuse suitable for 30 KVA UPS complete in all aspect all as specified and as directed. (Make:Exide/Amaron/V-Guard) |
| 17 | M&L comprehensive maintenance of FIRE Fighting /Fire Hydrant system installed at NEW OPD COMPLEX under Base hospital during the period of contract every month with complete testing of Fire hydrant system including Fire Pump, Hydronumetic System, valve , vessle, sprinklerand other connected items complete in all aspect in presence of Engg-in charge and New OPD Rep to their complete satisfaction.(i) Preventive maintenance of all systems on monthly basis and upkeep of log book.(ii) Attending all complaints within 24 working hours intimated by Engg-in-Charge.(iii) Field service report shall be maintained and submitted to the Engg-incharge after expiry of every month and before submission of RAR .(iv) The rates quoted by the contractor shall deemed to be inclusive of necessary T&P(v)A damage of Rs 500.00 per complaint per day shall be imposed on contractor, if the complaint shall not attended within 24 Hours of complaint intimated byEngr-in-Charge.(vi) Contractor also displays his contact number near Fire Alarm Panel and complaint shall be attended immediately within time frame given in particular specification. (vii) Every month Technician shall check serviceability of Fire detection system and serviceability report of Fire Alarm system shall be submitted by the contractor. |
| 18 | S&F uprightpendent glass bulb type sprinkler (standerd response)as per IS :15106/TAC for 68 degree of operation complete in all aspect all as specified and as directed. |
| 19 | S&Fsprinkler rossette 25 mm dia complete in all aspect all as specified and as directed. |
| 20 | S&F Sprinkler flexible type 1m size complete in all aspect all as specified and as directed. |
| 21 | S&F Sprinkler flexible type 1.5m size complete in all aspect all as specified and as directed. |
| 22 | Supply laying jointing and testing of Mild Steel ERW Medium (B) Sprinkler Pipe conforming to IS-1239 (Part-I) of size 25 mm dia including suitable size of Tee, socket ,union and neccesary T&P complete in all aspect all as specified and directed. |
| 23 | Description all as per item No 22 above but for 40mm bore pipe. |
| 24 | Description all as per item No 22 above but for 50mm bore pipe. |
| 25 | Description all as per item No 22 above but for 65mm bore pipe. |
| 26 | Description all as per item No 22 above but for 150mm bore pipe. |
| 27 | Supply and fix in replacement fire brigade inlet connection 2 way complete in all aspect all as specified and as directed. |
| 28 | Supply and fix in replacement hose reel drum of 36 m size complete in all aspect all as specified and as directed. |
| 29 | Supply and Fix in replacement branch pipe gun metal 63 m instantaneous inlet,made threaded outlet,15 mm bore nozzle short complete in all aspect all as specified and as directed. |
| 30 | S&F sluice valve 100mm bore class-1 ISI marked confirming to IS-14846 flanged ends drilled pressure rating PN 1.0 having stainless steel spindle with cast iron wheel at top complete with nuts, bolts, washers and rubber gasket including jointing and testing including taking out old unserviceable complete all as specified and directed. |
| 31 | S&F 80 mm bore hand operated butterfly valve of pressure capacity not less than 15 kg/sqm with complete set all as specified and as directed. |
| 32 | S&F 200 mm bore hand operated butterfly valve of pressure capacity not less than 15 kg/sqm with complete set all as specified and as directed. |
| 33 | M&L for Hose box made of 18 gauge MS Sheet 800mm X 600mm X 250mm with double door with 4 mm thick glass door frame made of 16 gauge MS sheet duly painted fire red out side and brilliant white inside yard including taking out old unserviceable complete all as specified & directed. |
| 34 | M&L for replacement of Power contactor, 3 pole, MNX 50 type (AC3 rating 22 Amp and AC1 rating 32 Amp of including taking down old & unserviceablecomplete all as specified and directed. Make : L & T/ ABB/ Siemen. |
| 35 | M&L for replacement of Power contactor, 3 pole, MNX 70 type (AC3 rating 22 Amp and AC1 rating 32 Amp as including taking down old & unserviceablecomplete all as specified and directed. Make : L & T/ ABB/ Siemen. |
| 36 | M&L for replacement of Power contactor, 4 pole, MCX02 type 25 Amp rating including taking down old & unserviceablecomplete all as specified and directed. Make : L & T/ ABB/ Siemen. |
| 37 | M&L for replacement of Power contactor, 4 pole, MCXA1 type including taking down old & unserviceablecomplete all as specified and directed. Make : L & T/ ABB/ Siemen. |
| 38 | M&L for replacement of Power contactor, 4 pole, MCXA2 type including taking down old & unserviceablecomplete all as specified and directed. Make : L & T/ ABB/ Siemen. |
| 39 | M&L for painting of complete Pump House including all assest pump motor and pipe lines in double cote to proper satisfaction of Engg-in-charge complete in all aspect all as specified and as directed. |
| 40 | M&L for replacement of Bimetal Over load Relay, 3 pole, MN-2 direct mounting on MNX-22type of relay range 14-23 Amp including taking down old & unserviceable complete all as specified and directed. Make as per Cat No SS94144OODO of L & T/ ABB/ Siemen. |
| 41 | M&L for replacement ofL& T Star Delta Timer MICON 225 3-120s 240 V AC complete in all aspect including taking down old & unserviceablecomplete all as specified and directed. Make: L & T/ ABB/ Siemen. |
| 42 | M&L for Single Phase Preventer, VSP2 type, 415 volts, 50 Hz including taking down old & unserviceable complete all as specified and directed. |
| 43 | M&L dismantalling of Electric motor driven centrifugal pump motor from base plate inside and arranging the necessory adjusting from fan belt, and then repairing /servicingMotor, capacity 45 KW , opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of suitable size including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed Note: The quoated rates must incl. loading & unloading with to and fro transportation for workshop and vice versa. |
| 44 | Repair , Overhauling & servicing of3 phase 415 Volt 180 LPM 2900 RPM 70 m head capacity 5.50 HP /4 KW centrifugal multi stage electric driven jockey pump complete all as specified & directed. |
| 45 | S&Fin replacement Pressure gauge of 100 mm dia range 0 to 21 kg/sqcm dual scale of 300 PSI accuracy 1% on full scale deflection complete all as specified and as directed. |
| 46 | S&F in replacement Pressure switch Range-0.2 to 7.5 Bar, IP 30 complete in all aspect all as specified and as directed. |
| 47 | S&F in replacement MCCB 40Amp rating 415 V 16 KA, 4 Pole 40 Amp complete in all aspect all as specified and as directed. Make: L & T/ ABB/ Siemen. |
| 48 | S&F in replacement MCCB 160 Amp rating 415 V 16 KA, 4 Polecomplete in all aspect all as specified and as directed. Make: L & T/ ABB/ Siemen. |