|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 3 | All kinds of soil. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 5 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 8 | Columns, Pillars, Piers, Abutments, Plinth beams.. |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 10 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 11 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. |
| 12 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 13 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 14 | 12 mm cement plaster of mix : |
| 15 | 1:6 (1 cement: 6 fine sand) |
| 16 | Setting 4.0 mtr steel gate in position including necessary repairs to steel members,aldrops etc.. &,supplyinggodrej lock(Navtal) .complete |
| 17 | Clearing & cleaning the terrace, including removing vegetation.taking out roots grown inside parapet/ WPT & disposal of the debris as directed by the engineer in charge. |
| 18 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. |
| 19 | Beyond 30 cm girth up to and including 60 cm girth |
| 20 | Trimming the branches of mango tree (2.0 nos) lean over the building without any damages etc.. Complete. |
| 21 | 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : including dismantling old plaster over terrace. |
| 22 | 1:3 (1 cement: 3 fine sand) |
| 23 | Enlarging the spout over shade slabs to 50mm dia pvc pipe of 30 cm length setting in cement mortar including removing existing pipe & making good complete. |
| 24 | Dismantling PVC water tank (2 nos) over terrace with all connections & refixing the same after waterproofingtreatment. |
| 25 | Pressure cleaning with water the terrace slab of the T.E.building. |
| 26 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : |
| 27 | One or more coats on old work. |
| 28 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. |
| 29 | With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre. |
| 30 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 31 | Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface). |
| 32 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3 mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc, and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 650/ 450N/ 5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane : note.the agency has to give 10 year performance guarantee.-Only flat area of the terrace will be measured for payment. |
| 33 | 3 mm thick |