Name of Work: Detail estimate for cleaning of HSCL nala from 870 m to 1500 mD/s side of HSCL Culvert left side
Sl. No.
Item Description
1
Part A
2
Clearing jungle including uprooting of rank vegetation, grass, brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.(As per DSR item no-2.31)
3
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. (Earth work for bed & slope)(As per DSR item no-2.8.1)(220x220x25)/4000000x115=34.78x 8no.for one gate (as per sanction rate of SE, IV circle, Jhansi vide letter no. 1014 Dt 13.02.2019) excluding of GST.service gate
4
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stocked materials, All kinds of soil. (1 no. lift)(Dia 60x60x25)/4000000x115=2.58x8 no.for one gate (as per sanction rate of SE, IV circle, Jhansi vide letter no. 1014 Dt 13.02.2019) excluding of GST.service gate
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.