|
| 1 | Breaking of reinforced cement concrete richer mix usig air compressor and pavement breaker includinghire charges of pavement breaker and air compressor with POL and operator disposal of unserviceable material within a lead of 50 mtr., cost of all labour charges minor tools, LWC & GST etc., complete. |
| 2 | Fixing of cast iron bollards of 10 Ton capacity confirming to relevnt IS specifications with all fitures such as anchor bolts, nuts and washers including fixing the bollards in position on the p roposed jetty structure, fixing the anchor bolts with template arrangements at the required locations at desired level and alignment as directed by Nodal Officer, excluding cost of bollards, anchor bolts, nuts & washers etc., which will be supplied by the department but including thecost of transportation charges of bollards and bolts to worksite, welding charges, all labour charges,minor tools, GST & LWC etc., complete. |
| 3 | Fixing of oldtruck tyres fenders of each set contanining two Nos. Tyre include making holes, cutting, including MS paint for eye bolt, fixing all fixturesexcluding cost of old tyre, heavy duty GInipple 2 1/2\" , GI flange 2 1/2\", 12mm wire rope/GI chain, wire grip/d-shackle which will be supplied by the department on free of cost,but including cost transportation charges of all materials to worksite, all labour charges, minor tools & plants, GST & LWC., etc., complete. |
| 4 | Providing and laying R.C.C 1:1.5:3 with 20mm size stone chips (one cement, one and half Mainland riverstone sandthree stone chips of size 2cm graded) in all RCC works as directed by the EIC, excluding cost of cement , cost of centering & shuttering charges which will be paid seperately, but including cost of stone chips and Mainland river river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator curing, all labour charges, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator, GST & LWC etc complete. |
| 5 | Conveying the sweepage, debris, broken concrete, rubbish wastage etc from the work site and transporation of the same by truck with in a lead of 14Km , including all labour charges, hire charges of truck with POL and operator, minor tools, GST, Cess etc., Complete. |
| 6 | Providing and fixing Tor steel reinforcement for R.C.C. work including cutting, bending, binding, and placing in position including cost of steel, binding wire, minor tools, GST & LWC etc. complete. |
| 7 | Providing and fixing of galvanised iron mooring ring at the required locations, level and alignment , including cost of mooring ring, bolts & nuts washers complete, cost oftransportation of mooring ring nuts & wahers , fixing with mooring bolt in concrete , cost of all labour charges , labour welfare cess, GST,cost of minor tools, etc, complete. |
| 8 | Painting two coats of synthetic enamel black paint on the surface of 10 Ton capacity bollarsover the bollards with white paint as required, including cost of paint, brush, transportation charges of all materials to work site, all labour charges and minor tools , GST, LWC etc., complete. |