| 1 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. On the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision) |
| 2 | Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 -60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction. - using grade II metal and bitumen - VG30 |
| 3 | Providing and laying bituminous concrete with HMP of capacity not less than 40 to 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 509 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material.-Bitumen -VG30 |
| 4 | Raising of various types of manholes and flushing tank by cutting alround the manhole cover, removing the frame and cover from the manhole by cutting the B.T., W.B.M., surface, raising the manhole to the required height with brick work in cement motar 1:4 (One cement and four sand), refixing the frame in position by laying cement concrete 1:1.5:3 (One cement one and half sand and three 20mm HBG metal) including curing, but excluding the cost of reinforcement, finishing the top, inside and outside plastering with 20mm thick in cement mortar 1:3(one cement three sand), the rate includes all materials, providing barricading,caution board, watch and ward etc.,complete till the completion of work with minimum hindrance to the traffic.- 30cm height |
| 5 | Providing, laying , spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layer by manual means in sub-base / base course on well prepared surface and compacting with smooth 3 wheeled steel roller to achieve the desired density |
| 6 | Centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate 20mm nominal size) |
| 8 | 12mm cement plaster finished with a floating coat of neat cement of mix - 1:3 (1 cement :3 fine aggregate) |
| 9 | Steel work welded in built up sections / framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required - in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |