| 1 | Civil Work |
| 2 | Removing the existing teakwood partitionsand handing over to the Undertaking at siteof work. |
| 3 | Breaking plain or reinforced cement concrete including stacking serviceable materials neatly and carting away debris out of the Undertaking\"s premises. |
| 4 | Removing existing teakwood / MS door withframe of any size and handing over to theUndertaking at site of work. |
| 5 | Removing the existing A C/G I sheet with allaccessories from walls and ceiling andhanding over to the Undertaking at site ofwork |
| 6 | Excavation in any strata excluding hard rock,for maximurn deprth of 1.50 metres |
| 7 | 15 cm thick dry rubble packing |
| 8 | Cement concrete (1:2:4) foundation |
| 9 | Structural steel work with two coats of `B\" Class enamel paint over a coat of primer. The weight of welding shall not be measured (Brought by the Contractor) |
| 10 | Structural steel work with M.S.Tabular hollow section The weight of welding shall not be measured(Bruoght by the contractor) |
| 11 | M. S Grill work as per \"Special Specifications\" |
| 12 | G.I. Crimplemesh 25mm x 5mm x 3.15mmdia size welded to M.S. Frame including; twocoats of \"B\"class enamel paint |
| 13 | Providing & fixing semi corrugatedGalvalume /PPGL-comax1000 or equivalentroofing sheet including PVC /Rubber coatedG.I.bolts (J / L shape) with rubber washer as per special specifications. |
| 14 | Providing & fixing semi corrugatedGalvalume north light curve sheet includingPVC /Rubber coated G.I.bolts (J / L shape)with rubber washer as per special specifications. |
| 15 | 10 cm x 10 cm CM (1:2) vata usingwaterproofing compound |
| 16 | Kotah stone (green or blue) double machinepolished (25mm to 40mm thick) flooring |
| 17 | 180mm dia half round PVC gutter with allits accessories including supporting M.S.brackets, scaffolding etc. |
| 18 | False ceiling with 6mm thick Bison Board fixed on Aluminium extruded sections. |
| 19 | 12mm thick Prelaminated Bison boardincluding fixing the same to the tata sectionby suitable means durected by the Engineer. |
| 20 | Aluminium frammed panelled door shutterwith partly prelaminated Bison board (12mmthick) panel prelaminated on both sides andpartly with Crimple mesh jali and M.S. Grillcomplete and as directed by the Engineer.* Rate Analysis enclosed. |
| 21 | Aluminium framed panelled door shutter with fully prelaminated Bison board (12mm thick) panel, prelaminated on both sides comlete and as directed by the Engineer |
| 22 | Shifting of structural steel cash collection centre transporting released materials of existing chowkey to Oshiwara Scrap yard. |
| 23 | Standard single pedestal table as per Drg No81-23085 |
| 24 | Standard Chair as per Drg No. 81-18119 |
| 25 | Aluminium framed double shutter panelleddoor with fully prelaminated Bison board(12mm thick) panel, prelaminated on bothsides comlete and as idrected by theEngineer |
| 26 | Removing the existing concrete interlockingpaver block and stacking the serviceableblocks neatly at site and carting away thedebris out of the undertaking permises asdirected by Engineer. |
| 27 | Labour for fixing Interlocking concreteblock/paver flooring as per \"specialspecifications\"(using released servicebleinterlocking concrete blocks /paver flooringof any thickness free of cost) |
| 28 | 80 mm thick Precast coloured Interlockingblock (Medium Duty) including beddingstone grit etc as per \"Special Specifications\". |
| 29 | Anticorosive and protective coating usingEpoxy finish coat (One Coat) and acrylicaliphatic polyurethane material (two coats)over a coat of primer containing polysulfideepoxy resin and zinc phosphatemanufractured by Glo-Proteckor equivalent. |
| 30 | Nigth latch(Godrej make) Please Enable Macros to View BoQ information |