| 1 | Carriage of followings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required completion of work, distance about to 45 to 70 Km. approx. |
| 2 | STP/PCC Pole of 8.5/11 mtr Long from E.S.C Bulandshahr to Site. |
| 3 | CT/PT unit 10/5A Different spacification from ESC. BSR to site with the help of Crane. |
| 4 | Piffer ressitant metering cubicle from ESC. BSR to site with loding and unloading the help of Crane. |
| 5 | TVM 11 KV |
| 6 | Cable 3x70 sqmm 11 KV XLPE with loading and unloading the help of Crane. |
| 7 | Carrage 25/63/100 kva TF with loading and unloading |
| 8 | Carriage of All line Material from store to site or j.e\"s store as ACSR Weasel conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator & Pin Insulator etc. |
| 9 | Erection of Single support including complete 1 LT fittings as per RESPO manual and as per direction ot Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Erection of Double Pole support including complete 1 L.T. fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 11 | Grouting of Single support including complete 1 LT fittings as per RESPO manual and as per direction ot Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Grouting of D/P for installation of CT/PT unit & T/F shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 13 | Fixing of Stay rod with Stay wire in proper way with Nozelling. |
| 14 | Mounting & Installation 25/63/100 kva T/F on the double Pole |
| 15 | Grouting of Stay rods. |
| 16 | Fixing of erathing rod. |
| 17 | Laying of 3x70 sqmm 11KV XLPE cable putting sand around the cable Fixing of bricks in both sides & top and refilling of trench and its proper ramming including providing necessary loop on both sides. |
| 18 | Laying, sagging. Stringing and binding and jumpering of ACSR weasel, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 19 | Mounting CT/PT unit on D/P with the help of Crane. |
| 20 | Fixing of Cable Box suitable for 3X70 sqmm 11KV XLPE. |
| 21 | Providing & Fixing Holding Clamps. |
| 22 | Laying and ABC Cable |
| 23 | Providing & Fixing Stay Clamps. |
| 24 | Providing & Fixing Stay Insulator. |
| 25 | Providing & Fixing F Clamp. |
| 26 | Providing Nut & Bolts off-size |
| 27 | Installation & Errection of Piffer ressitant metering cubicle . |
| 28 | Above work shall be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |