| 1 | fo|qr uxjh; forj.k [k.M&cqyUn\"kgj ds vUrxZr iw.kZ tek ;kstuk en esa lM+d pkSM+hdj.k ,oa lqn` |
| 2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. |
| 3 | S.T Pole 11 Mtr. Long |
| 4 | S.T Pole 9 Mtr. Long |
| 5 | Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Rabit conductor, Dog conductor, ABC, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Pin Insulator. Disc Insulator, 33kv & 11kv X Arme etc. |
| 6 | Erection of Single pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 7 | Erection of Double pole/Section Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 8 | Erection of Four pole/Section Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 9 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 11 | Grouting of Four pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Carriage of All line Material from J.E store Sub station to Pit Site ACSR Rabit conductor, Dog conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Pin Insulator. Disc Insulator, 33kv & 11kv X Arme etc. |
| 13 | Cutting /drilling /Welding of MS Angle iron for making guarding angle size 65x65x6/50x50x6 mm including the work of fixing the bracket on PCC/ST pole for construction of the line. |
| 14 | Fixing of 33kv/11 Kv Stay rod with Stay wire in proper way with Nozelling |
| 15 | Grouting of 33kv/11 Kv Stay rods |
| 16 | Guarding of 11/33 K V line at road crossing by laying 3 Nos. Gl wire of size 6/8 SWG parallel and fixing of lacings (Tilli) at a distance at 1.5 mlrs as per direction of supervising engineer/RESPO mannual it. Includes the cost of labour,T&P carrier etc. required lor proper completing of work |
| 17 | Erection & Fixing Of 11kv. Tpmo Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Tpmo Set Will Be Provided By The Department). |
| 18 | Laying, sagging. Stringing and binding and jumpering of ACSR Weisal , rabbit, dog newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 19 | ACSR Rabit/Dog conductor |
| 20 | LT ABC Cable off size |
| 21 | Fixing of Earthing rod |
| 22 | Providing & Fixing of Danger Board with clamp |
| 23 | Providing & Fixing of Number Plate with clamp |
| 24 | Fixing of 33 KV DISC insulator with fitting |
| 25 | Fixing of 33 KV/11KV F Braket |
| 26 | Fixing of 33 KV PIN |
| 27 | Fixing of 11 kv pin insulator |
| 28 | Fixing 11 kv disc insulator with fitting |
| 29 | Fixing of 11 KV V Type X rm |
| 30 | Fixing of 33 KV V Type X rm |
| 31 | Fixing of Top/Drop Channel |
| 32 | Fixing of MS T Off Channel |
| 33 | Fixing of MS Clamp |
| 34 | Fixing of Fuse set |
| 35 | Fixing of Distributin box 1, 3 Ph |
| 36 | Fixing of Nut & Bolt off size |
| 37 | Providing & Fixing of 33, 11kv X Arme holding clamp |
| 38 | Providing & Fixing of Dad & clamp |
| 39 | Providing & Fixing of suspention clamp |
| 40 | Providing & Fixing of J/I Hook |
| 41 | Providing & Fixing of I Bolt |
| 42 | Providing & Fixing of Pearcing conector |
| 43 | Providing & Fixing of Bombu spicer |
| 44 | Providing Fixing of ston pad |
| 45 | Providing & Fixing of Barbed wire |
| 46 | Providing & Fixing of All. Bindind wire |
| 47 | Providing & Fixing of All. Paint |
| 48 | Providing & Fixing of PG clamp |
| 49 | Providing & Fixing of Red oxied Paint |
| 50 | Providing & Fixing of LT Shekle insulator |
| 51 | The folloing material is required to be supplied by the contractor. |
| 52 | Providing of MS Clamp |
| 53 | Providing of Nut & Bolt off size |
| 54 | Providing of 33 Kv, 11kv F Bracket |
| 55 | Trimming the branches of trees and removing the cut branches from the side and placing them at another place. |
| 56 | Recive back material. |
| 57 | OLD & Used Damaged ST,Gardar Pole Scrap |
| 58 | MS scrab |
| 59 | ACSR condctor wire scrab Please Enable Macros to View BoQ information |