| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, withina lead of 50m All kinds of soil.(2.8.1) |
| 2 | Supplying and filling in plinth with Jamuna sand under floors including, watering, rammingconsolidating and dressing complete.(2.27) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). (4.1.8) |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 infoundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand)(6.1.2) |
| 5 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer\"s specification.(4.12) |
| 6 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil.(4.13) |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)(6.4.2) |
| 8 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.Cement mortar 1:4 (1 cement :4 coarse sand)(6.13.2) |
| 9 | Centering and shuttering including strutting, propping etc. andremoval of form for:foundation, footing,bases of column, etc. for mass concreate (5.9.1) |
| 10 | Centering and shuttering including strutting, propping etc. andremoval of form for:Lintels,beams, plinth beams, girders, bressumers and cantilevers (5.9.5) |
| 11 | 12 mm cement plaster of mix :1:6 (1 cement : 6 fine sand) (13.1.2) |
| 12 | 15 mm cement plaster of mix :1:6 (1 cement : 6 fine sand) (13.2.2) |
| 13 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied@ 2.20 kg/10 sqm)(13.46.1) |
| 14 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size derived from natural sources). 5.1.2 |
| 15 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)(5.2.2) |
| 16 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(5.3) |
| 17 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars. (5.22.6) |
| 18 | Steel work welded in built up sections/framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc.as required. In gratings, frames, guard bar, ladders, railings, brackets, gates & similar works. (10.25.2) |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture togive an even shade :Two or more coats on new work (13.62.1) |
| 20 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar ( 15.7.4) |
| 21 | Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.(15.19 |
| 22 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.(15.60) |