| 1 | Repair and Painting works in Shipping office building at FACT (Cochin Division), Wiilingdon Island,Kochi. |
| 2 | Cleaning thestructural/other surface neatlyat all heights, manually with suitable tools or with high pressure water jet spray (using suitable mechanical means), and scraping if required, to remove the whole accumulateddust, rust, dirt etcas per departmental instructions. |
| 3 | Dismantling and removing doors with or without ventilators including removal of shutters, hinges, holdfast and all other fittings and stacking materials as per deptl.instructions |
| 4 | Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out & removal of debris if any within a lead of 150 m. |
| 5 | Chipping & removing old cement plastered surface including racking out joints & clearing the surface for replastering & disposal of the debris as per directions within a distance of 150 m. |
| 6 | Glazing / Panelling the Aluminium frame work of doors / other ares with 5.50 mm glass and 4 mm thick hylam sheets (40 % hylam sheet aproximate ) and powder coatedAluminium approved brand beadings, with EPDM / NEOPRINE weather seals, gaskets of EPDM or PVC etc and screws as per standard practice at all levels (Measurement for overall area of doors other area) |
| 7 | Supplying and fixing anodized Aluminium frame work of extruded sections and approved brand / manufacturer including mitering the joints, fixing the frame work with necessary screws, drilling holes in floors/walls, providing plugs for fixing screws, finishing the sides of packing between frame work and walls with plaster of Paris, cost of timber packing if necessary, Rubber lining for air tightness, providing corner cleats etc.complete as per standard practice for glazed Doors, Windows, Partitions, Ventilators etc.including hinges ,pivots, tower bolts, fixtures etc.complete(All Aluminum works including fittings measured in Kg) |
| 8 | Providing cup board shutters with approved quality wooden series Aluminium profiles having show case frame of size 66x32.5x0.83 mm,shutter frame of size 41.90x23x0.98 mm, Intermediate frame of size 32x32x0.80 mm (If required) as per reqirement,covered with 3 mm hylam sheet inclusive of SS Handless,75 mm SS hinges , Magnetic latches , necessary cleat angle,rubber beedings & corners with all fixtures in SS screws etc complete as per directions at site |
| 9 | Providing and fixing double scaffolding system for all type of works using 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical joining with cup & lock system including necessary working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge (The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding). |
| 10 | Supplying, Conveying, fabrication and erection of structuralsteelwork bolted orweldedatall levelsasper scopedrawingfortrusses, purlins,louverbrackets,louver runners bracings, stair cases, platforms, handrailsladder,threadedsagrods,splices,etc. withM.Sangles,channels,tees, flats, RSJs,rods, pipes and plates including cutting, welding, cleaning, erecting and painting with twocoats of zinc chromate primer (oneshop coatand one coat after erection)and two coats of chemicalresistant enamelpaint of approvedquality and colouroverthe primerincludingsupplyofnecessary MS boltsandnutsother than holdingdown bolts.(The structural steel material shall be of M/s. SAIl / RINL / TISCO /JINDAL make) Required gas and electrodes will be supplied free of cost by FACT at stores. |
| 11 | Cement plastering with CM 1:4, 15 mm thick one coat floated hard and trowelled smooth at all levels,includind cost of cement. |
| 12 | Polishing of doors , windows, cup boards, furnitures etc at all heights by (1) cleaning the old surface well after removing the old polished surface and sand papering to get smooth finish (2) Applying wood sealer of M/s. Asian or Berger, two coats after filling the voids/cracks with suitable filler if required (3) Applying 2 coats of polish \"Touch wood\" or equivalent to obtain smooth finish. Rate shall also include charges for necessary scaffolding works at site. Care shall be taken to cover all the glass surface before polishing and remove the same after polishing. |
| 13 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 14 | Applying water thinnable cement primer one coatfor exterior and interior wallsof approved brand and manufacture at all heightsincluding cost of all labour ,materials and scaffolding charges. |
| 15 | Painting two coats with ready mixed plastic emulsion paint of approved quality and colour specified over the priming coat already done and paid separately after cleaning the surface well. |
| 16 | Painting with two coats of acrylic emulsion exterior paint of approved brand and shadeat all heights as per manufacturer’s specification including cleaning the surface well. |
| 17 | Painting with one coat of zinc chromate yellow metal primer and two coats of synthetic enamel paint using approved brand & quality at all heightsafter cleaning the surface including cost of all paint and materials, labour charges, scaffolding charges etc.complete as per deptl instructions |
| 18 | Shipping office Name board -Vinyil Non Light board LG vinyl pasted on high quality Star flex. Frame work 25 mm GI with epoxy painting.(board size - 3.6 m X 1.2 m approximate) |
| 19 | Collecting ,conveying and Disposal of building rubbish/ debris/similar unserviceable,dismantled or waste materials by manual/ mechanical means, including loading, transporting, unloading to approved areasfor filling, spreading in layers as per directions of Engineer-in-charge (20% deduction will be made if measured loose in lorries & from stack) - For an average lead of 2 KM |
| 20 | Providing man Mazdoor forlabour assistancefor emergency works which are not covered in the Schedule of work. |