| 1 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it\"s packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it\"s primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. |
| 2 | Nominal bore 150 mm dia. |
| 3 | Add 15% extra on above item (Item No 2.4.1 to 2.4.2) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. |
| 4 | Add 40% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr . |
| 5 | Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. |
| 6 | Nominal bore 150 mm dia. |
| 7 | Add 15% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. |
| 8 | Add 30% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . |
| 9 | Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. |
| 10 | Nominal bore 150 mm dia. |
| 11 | Add 15% extra on above item (Item No 2.4.1 to 2.4.2) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. |
| 12 | Add 30% extra on above item (Item No 2.4.1 to 2.4.2) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . |
| 13 | Construction of tube well from ground level and up to 100 mtr. depth and above of following sizes in all types of soils in alluvium strata, unconsolidated formation such as pebbles, boulders etc. by \"bailing\" method and without gravel packing as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work includes formation of cavity at bottom by development with appropriate air compressor or bailer pumping and also lowering of casing pipe but excluding cost of the casing pipe. The tube well should have a throughout bore as per nominal dia of casing pipe. The work would be completed after obtaining sand free |
| 14 | Nominal bore 125 mm dia. |
| 15 | Nominal bore 150 mm dia. |
| 16 | Construction of tube well from ground level and up to 100 mtr depth and above to accommodate housing assembly pipe in all type of unconsolidated formation such as pebbles, boulders, collapsible formation etc. by Odex drilling method as per IS: IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work will include lowering of housing and strainer pipe assembly and casing shoe including cost of casing shoe, but excluding cost of the casing pipe. The work would be completed after obtaining sand free water. |
| 17 | Nominal bore 125 mm dia. |
| 18 | Nominal bore 150 mm dia. |
| 19 | Add 15% extra on above item (Item No 2.6.1 to 2.6.3) for drilling depth beyond 100 mtr, rate shall be applicable for only extra depth beyond 100 mtr . |
| 20 | Deepening of existing tube well by DTH system beyond existing depth up to 100 mtr. and above in all type of rocks including flushing of tube well and obtaining sand free water. |
| 21 | Nominal bore 150 mm dia. |
| 22 | Testing verticality of tube well by plumbing system and yield test and draw down test by pumping system as per IS : 2800 (Part – II) – 1979 or as per amended up to date. |
| 23 | Supplying & Packing P-gravel suitable for slot size/mesh size as suggested in IS 2800 (Part-1) 1991 or as per amended up to date. |
| 24 | Development of tube well having depth up to 250 mtr as per IS: 11189- 1985 and IS: 2800 (Part- I)- 1991 (both amended up to date) using suitable methods to give sand free water for required yield of the gravel packed tube well. |
| 25 | Supply of ERW M.S. black casing pipe ISI marked (IS: 4270/2001) or amended up to date of following sizes |
| 26 | 150 mm dia NB(Thickness of pipe 5.0 mm & mass of tube 20.13 Kg/m) |
| 27 | 125 mm dia NB( Thickness of pipe 4.8 mm & mass of tube 16.40 Kg/m) |
| 28 | Labour charges for making slots on blank pipes made of ERW MS black pipe ISI marked of following sizes, the slotting should be as per IS:8110-1985. |
| 29 | 125 mm dia nominal bore of 4.8 mm thickness |
| 30 | 150 mm dia nominal bore of 4.8 mm thickness |
| 31 | Supply & Installation of single phase ISI marked submersible motor pump set of three star or better rating of BEE and as per IS: 8034-2018 (pump) and IS 9283-2013 (motor) or as amended up to date of approved make of following duty condition with required accessories including making connection suitable for tube well/DCB. The job includes lowering of motor pump, installation of complete fitting & accessories, jointing of electrical cables up to switch board, testing of submersible pump set and interconnection up to water mains, complete in all respect. |
| 32 | Up to 2.0 KW |
| 33 | Above 2.0 KW |
| 34 | Supply and Fixing of Electric feeder panel (having projected canopy)for submersible pump set Single phase up to 5 HP, comprising of DOL Starter, MCB, Indicating Light, Ammeter, Volt meter, connection plate, condensers of approved make and the panel enclosure should be made out from 18 gauge M.S. Sheet with powder coating. Panel size Height 600 mm Width 500 mm depth 250 mm with Stand ( made of angle iron of size 35x35x5mm) duly bolted/screwed with enclosure box having 4 legs, each leg’s length 18\" and double door including in built locking system. The legs should be embedded in M-15 cement concrete platform. The size of CC platform should be equal or bigger than the base size of panel having height of at least 200 mm from ground level. The operation of panel should be suitable for on 240 Volt AC Supply. |
| 35 | Supply & Fixing of ISI marked three core PVC flat submersible cable as per IS 694:1990 or amended up to date and conductor as per class 5 of IS 8130:1980 including making connection etc. |
| 36 | 3 core 4.0 Sq.mm |
| 37 | 3 core 6.0 Sq.mm |
| 38 | 3 core 10.0 Sq.mm |
| 39 | 3 core 16.0 Sq.mm |
| 40 | Supply & Fixing XLPE insulated / P.V.C. sheathed cable of 1.1 KV grade with aluminium conductor Armoured of IS:7098-I/1554-1 approved make in ground as per IS:1255 including excavation of 30cmx75cm size trench, 25 cm thick under layer of sand, second Class bricks covering, refilling earth, compaction of earth, making necessary connection, testing etc. as required of size. |
| 41 | 10.0 Sq.mm, 4 core |
| 42 | 16.0 Sq.mm, 4 core |
| 43 | 25.0 Sq.mm, 3.5 core |
| 44 | 35.0 Sq.mm, 3.5 core |
| 45 | Plate Earthing as per IS:3043 with G.I. Earth plate of size 600mm x 600mm x 6.0mm by embodying 3 to 4 mtr. below the ground level with 20 mm dia. G.I. \"B\" class watering Pipe including all accessories like nut, bolts, reducer ,nipple, wire meshed funnel, and C.C. finished chamber covered with hinged type with locking arrangement C.I. Cover, C.I. Frame of size 300mm x 300mm complete with alternate layers of salt and coke/charcoal, testing of earth resistance as required. |
| 46 | Supply & Fixing M S clamp set of 50x6 mm flat from iron with nuts and bolts etc. for holding the riser pipe assembly of submersible pump set. |
| 47 | Supply & Fixing tube well cover of MS sheet 8mm thick at top & 5mm thick 100mm wide shroud around the edge so as to form a cap on the top end of casing pipe with GI Nipple 45cm long & two GI flanges at both ends in 80mm sizes passing through a hole in the centre of MS sheet. A 25 mm socket with end plug shall also be welded over top plate. A GI nipple having outside thread of size 1/2\" (for installation pressure gauge) shall be provided & welded with 80mm GI nipple near top plate nipple shall be provided with end plug. |
| 48 | 125 mm dia |
| 49 | 150 mm dia |
| 50 | Providing, installing, testing and commissioning of double flanged bulk flow meter with removable mechanism, of class B conforming to ISO 4064/1 or amended up to date of approved make including cost of all material and labour as per specifications with GI Box (sheet 16 SWG) suitable with locking arrangement of following dia. |
| 51 | 50 MM dia |
| 52 | Providing & Fixing pump safety cage as per specifications or as directed by Engineer in charge. |
| 53 | Providing and Fixing of ISI marked PVC storage tank of following capacity as per IS: 12701-1989 (of approved make) with cover, 25 mm dia. 1 mtr long GI overflow pipe, 25 cm long 25 mm dia washout GI pipe with plug & socket, including P&F 32 mm dia Ball Cock (Float valve) IS 1703 marked with rod and PVC ball complete with brass weight 1000 gm, including P&F 15mm dia CI quarter turn heavy duty Bib Cocks four no\"s of superior quality and approved make, including interconnections complete job. |
| 54 | 1000 litres capacity |
| 55 | 2000 litres capacity |
| 56 | Fabrication & Fixing M.S. Stand of specified class of angle iron L-shaped of 50 mm size with four legs grouted by 300*300*300 mm CC Block M-15 in the ground and all legs tied up with each other through same size of angle iron along with cross bars to support the bottom of 1000 Ltr./ 2000 Ltr. PVC tank complete in all respect. |
| 57 | Providing & Fixing of double flanged, CI body, ISI marked NRV of approved make of following sizes |
| 58 | 65 mm dia |
| 59 | Proving and Fixing 32 mm dia Full way valve or wheel valve as per IS:778 or amended up to date of approved make, on pump delivery pipe. |
| 60 | Supplying & Installing 100 mm diameter sealed diaphragm bourdon type pressure gauge of range 0 to 10 kg. including all jointing material as per specification with safety cover. |
| 61 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it\"s packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it\"s primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. |
| 62 | Nominal bore 125 mm dia. |
| 63 | Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr. |
| 64 | Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. |
| 65 | Nominal bore 125 mm dia. |
| 66 | Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr. Please Enable Macros to View BoQ information |