| 1 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand (including cost of sand) on completion of steining works. B.ii) 3.60 metre diameter of digging for 2.40 mtr internal diameter of well. a) Upto 3 m. below G.L. |
| 2 | b) Beyond 3 m upto 6 m. below G.L. |
| 3 | c) Beyond 6 m upto 9 m. below G.L. |
| 4 | Extra rock cutting over the corresponding rate for digging for the respective internal diameter of the well will be allowed on the different stage of depth. i) 05% extra for cutting moorum. a) Upto 3 m. below G.L. |
| 5 | iii) 300% extra for cutting hard rock in built up areas using chisel, jamper and manual labour. b) Beyond 3 m upto 6 m. below G.L. |
| 6 | iii) 300% extra for cutting hard rock in built up areas using chisel, jamper and manual labour. b) Beyond 6 m upto 8.5 m. below G.L. |
| 7 | First class brick work for staning wall of well in cement mortar (4:1) including cutting bricks if required. Upto 6 m depth below G.L. |
| 8 | First class brick work for staning wall of well in cement mortar (4:1) including cutting bricks if required. Beyond 6 m upto 9 m depth below G.L. |
| 9 | Brick work with first class bricks in cement mortar (1 : 4) . (a) In foundation and plinth. Above G.L. |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints including throating, nosing and drip course, scaffolding/ staging where necessary ( ground floor) [ excluding cost of chipping over concrete surface]. ii) With 1:6 cement mortar, 15 mm thick. |
| 11 | Neat cement punning about 1.5 mm thick wall, dado floor drain etc complete |
| 12 | Well Curb made with Ordinary Cement concrete (mix 1:1.5:3) with Pakur variety stone chips (20 mmnominal size) excluding shuttering and reinforcement if any, |
| 13 | Reinforcement for R.C.C. work in al sorts of structure including distribution bars stirrups, binders, etc. including supply of rods, initial straightening of bent bars excluding coil bars and removal of loose rust (if necessary) cutting to requisitite length.(a) For works in foundation, basement and upto roof of groundfloor/upto 4 m(i) Tor steel/Mild SteelII. Other Than SAIL/ TATA/RINL |
| 14 | Cost of Sign Board including Painting & lettering etc. in all complete |
| 15 | ADD SGST 9% for item no 1 to 9 |
| 16 | ADD SGST 9% for item no 1 to 9 |
| 17 | ADD Labour Welfare cess 1% for item no 1 to 11 Please Enable Macros to View BoQ information |