|
| 1 | Azimuth thruster hydraulic works, type: fu-80-ltc-2250 make: Brunvoll as NorwayAzimuth thruster hydraulic system overhauling works to be carried out,Azimuth thruster to be lowered in dock floor at availble space(1.6 mtrs,i.e. height between dock floor to ship hull) and satisfactory trials to be showned to the ship, all spares,consumables,certified tools and tackles,masuring instruments shell be within the vendor\"s scope of supply. |
| 2 | Azimuth thruster hydraulic system operation to be checked. |
| 3 | Overhauling of Hydraulic Power unit Servo pumps, requried spares are in vendor scope. |
| 4 | Overhauling of Hydraulic control valve for locking device, requried spares are in vendor scope. |
| 5 | Overhauling of Hydraulic control valve for Lowering/Retracting, requried spares are in vendor scope. |
| 6 | Overhauling of Hydraulic control valve for Pitch control, requried spares are in vendor scope |
| 7 | Overhauling of Hydraulic control valve for Slewing/Azimuth rotation, requried spares are in vendor scope. |
| 8 | Pressure testing of Relief valves, requried spares are in vendor scope. |
| 9 | Replacement of Filters, Filters and requried spares are in vendor scope. |
| 10 | Steering Hydraulic motors to be checked for Azimuth rotation and brakes |
| 11 | Steering Hydraulic motors to be serviced for Azimuth rotation and brakes, requried spares are in vendor scope |
| 12 | Overhaul of Hydraulic Lock, requried spares are in vendor scope. |
| 13 | Overhaul of Hydraulic cylinders, requried spares are in vendor scope. |
| 14 | Cooler cleaning and pressure testing, requried spares are in vendor scope. |
| 15 | Hydraulic power unit tank cleaning and Oil changing,supply of oil Ship scope. |
| 16 | Anticipatory work: During Dry docking,if the Azimuth thruster Hydraulic power unit is found to be non-operetionaleven after overhauling,the vendor shell arrange equivalent or compatible Hydraulic power unit for lowering andretracting the azimuth thruster to facilitate thruster overhauling works. |