| 1 | Part A: Transportation, installation, necessary fabrication, commissioning & trial run of one no. 1000mm width, 2×150kW, 6.6kV drive belt conveyor along 23D from 59L to 54L in R-VII seam |
| 2 | Loading, transportation and unloading of one breaker (6.6kV/200A), starter (6.6kV/2×150kW), LS unit to 58L/23D/R-VII with help of haulages & 20 mtr manually |
| 3 | Laying-hanging of 100 mtr 6.6kV grade 70 sq.mm. PVC DWA cable from VCB to 58L/23D starter manually |
| 4 | Transportation of the 1000mm width, 2×150kW, 6.6kV drive head unit complete with loop take-up structure, look-out arrangement and installation at 58L/23D (R-VII) with necessary fabrication |
| 5 | Transportation of 370 mtr 1000mm width PVC belting from dismantled site to 23D belt installation site (23D/58L) with help of haulages & 60 mtr manually |
| 6 | Laying, lapping, jointing & tensioning of this 370 mtr 1000mm width PVC belting in proposed 23D belt |
| 7 | Transportation of 500 mtr belt sequence cable, then laying-placing them from previous belt starter to 23D belt starter placed at 58L/23D in R-VII seam |
| 8 | Testing, trial run, alignment & commissioning of 59L belt conveyor from 59L/23D to 54L/23D in R-VII seam |
| 9 | Supply of DA cylinder (@ 6.2 cu.mtr/cyl.) |
| 10 | Supply of Oxygen cylinder (@ 7.1 cu.mtr/cyl.) |
| 11 | Supply of 5T Turnbuckle 89 G 63-88 |
| 12 | Supply of M.S. Nut & Bolt 5/8\"×2\" |
| 13 | Part B. Civil foundation work |
| 14 | Civil foundation works for installation of 2×150kW, 6.6kV, 1000mm wide belt conveyor drive head, discharge unit, loop take-up unit and platform for ACB, starter for proposed 23D belt conveyor of 3 & 4 incline, JPC |
| 15 | Part C: Roof heightening work |
| 16 | Roof heightening by drilling, blasting in stone, cleaning, roof bolting including cost of drill rod, drill bit for installation of proposed 23D belt conveyor in R-VII seam of 3 & 4 incline under JPC (with GST) |
| 17 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |