| 1 | Side clearence & malva cleaning, site photograps etc. |
| 2 | Dismentling of cc etc all complete. |
| 3 | Dismentling of Damaged C C S.I. No-692 |
| 4 | Earthwork in excavation in ordinary soil including 1.50 mt lift & 30 mt lead etc all complete. |
| 5 | P/L CC 1:6:12 in cement f sand & 40mm brick ballast etc all complete. |
| 6 | RCC work in 1:2:4 cement ,c.sand&20mm stone Grite etc all complete. S.I.NO 284(A) |
| 7 | M.S. work or iron in plain work including cutting, molding S.I. No. 504 |
| 8 | M-150 class brick work 1:4 cement ,c. sand mortar etc all complete.S.I.NO 305(b) |
| 9 | Construction of granular sub-base (GSB) by providing well graded material, spreading in uniform layers and its well consolidation including etc all complete. |
| 10 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as (602) |
| 11 | 12mm thick cement plaster 1:3 cement ,c. sand mortar etc all complete S.I.NO. 580 |
| 12 | PCC work in 1:2:4 cement ,c.sand& stone Grite etc all complete SI No. 279(B) |
| 13 | Disposal of Dismentelled Damaged CC Up to 1 Km etc all complete. Chapter -3 cartage 231 A 1.1(IInd) (Ist) |
| 14 | Ded Cost of Brick Bats |
| 15 | S/F innaugration stone/ sign board.etc all complete. Please Enable Macros to View BoQ information |