| 1 | Taking down cement plaster on brick wall,concrete surfaces etc including racking out joints, hacking for key, scrubbing down with water etc complete all as specified and as directed. Note :- (i) The rate should include the rate of ladders or scaffoldings needed as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. |
| 2 | Materaial and laabour rendering 15 mm thick on brick work or concrete surfaces or in chajjas/parapet walls etc in two layers in cement mortar 1:4 mixed with liquid water proofing compound as per manufacturer\"s instructionsfinished even and fair complete all as specified and as directed by Engineer-in-Charge. Note :- (i) The rate should include the rate of ladders or scaffoldings needed as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. (iii)WPC shall be measured & paid separately. |
| 3 | Material and labour for preparation of new plastered surface of walls and applying one or more coat of( 1 mm thick to 3mm) thick wall care putty for levelling the surface, rubbing the surface to achieve smooth surfaceand applyingtwo coat of Acrylic Smooth exterior paint of required shade (New Camouflage or light shade) applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm)as per manufacturer instructions complete all as specified and as directed by Engr-in-charge.Note :- (i) The quoted rate shall inclusive of costof ladders or scaffoldings required as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. |
| 4 | Material and labour for rendering 5 mm thick on concrete surface as on ceilings in cement mortar 1:3finished even and smooth without using extra cement complete all as specified and as directed by Engr-in-charge.Note :-(i) The quoted rate shall inclusive of costof ladders or scaffoldings required as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. |
| 5 | Supply only integral liquid water profing compound complete all as specified and as directed by Engineer-in-Charge. |
| 6 | Material and labourL for preparation of newely plaster surface of ceiling and applying three coats of white washcomplete all as specified and as directed by Engineer-in-Charge.Note :-(i) The quoted rate shall inclusive of costof ladders or scaffoldings required as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. |
| 7 | Material and labour Cutting or uprooting grass on old mud phuska, removing rubbish off the premises (outside Mod Land) cleaning surfaces to recieve finishescomplete all as specified and as directed by Engineer-in-Charge.Note :- (i) The quoted rate shall inclusive of costof ladders or scaffoldings required as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. |
| 8 | Material and Labour for chalk whiting, on roof surfaces, preparatory to distempering/ Acrylic smooth paint etccomplete all as specified and as directed by Engineer-in-Charge.Note :- (i) The quoted rate shall inclusive of costof ladders or scaffoldings required as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height.. |
| 9 | Material and Labour for complete removal of existing paint treatment on wall/ roof/ roof projection including facia, cornices etc tothe entire stasifaction of Engineer-in-charge complete all as specified and as directed by Engineer-in-Charge.Note :- (i) The quoted rate shall inclusive of costof ladders or scaffoldings required as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. |
| 10 | Material and labour for preparation ofold plastered surface of walls and roofs etc and applying one or more coat of( 1 mm thick to 3mm) thick wall care putty for levelling the surface, rubbing the surface to achieve smooth surface and applying two coat of Acrylic Smooth exterior paint of required shade(New Camouflage or light shade) applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instructions complete all as specified and as directed by Engineer-in-Charge.Note :- (i) The quoted rate shall inclusive of costof ladders or scaffoldings required as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. |
| 11 | Material and labourfor prepration ofold plastered or unplastered surface of walls/ceilings etc and applying two coats of white wash complete all as specified and as directed by Engineer-in-Charge.Note :- (i) The quoted rate shall inclusive of costof ladders or scaffoldings required as per the requirement for the execution of work. (ii) The work has to be executed upto 8-10 Mtr height. |
| 12 | Material and labour for praparation of old paintedsteel and iron surfaces of any description over 10 cm width or girth not otherwise described and applyingtwo coat of synthetic enamel paint [New Camouflage (outside) or light shade (inside)] over and includinga coat of red oxide primer complete all as specified and as directed by Engineer-in-Charge. |
| 13 | Material and labour for preptation of plastered or unpastered ( new or old ) surface of walls /ceiling etc and applying one coat of wall care putty (not less than 01 mm ) thickto level the surface and rubbing rhe puttied surface to achieve the smmoth surfacefor painting etc complete all as specified and as directed by Engineer-in-Charge. |
| 14 | Demolition of brick work built in cement mortar including all quoins arches, pillarsetc complete all as specified and as directed by Engineer-in-Charge. |
| 15 | Material and labour for brick workusing sub class ‘B’ bricks, straight or curved on plan exc 6m mean radius built in cement mortar 1:6complete all as specified and as directed by Engineer-in-Charge. |
| 16 | Dismantling of brick tiles or terracing tiles single layers on roofs complete all as specified and as directed by Engineer-in-Charge.Notes:- (i)If any lightining conducture will found duing dismantling of roof tiles at site shall be carefully removed and refixed in the same position after laying of APP membrane as per direction by Engr-in Charge. (ii)No additional rate shall be paid for removal and refixing of lighting conducture to the contractor. |
| 17 | Demolition of mud phuska on roof any thickness and removed the debris outside MOD land complete all as specified and as directed by Engineer-in-Charge. |
| 18 | Material and labour for 25 mm thick cement concrete 1:2:4, type B0 using 12.5 mm graded stone aggregates as in roof padding, levelling course etc complete all as specified and as directed by Engineer-in-Charge. |
| 19 | Material and labour for renering 10 mm thickon roof / parapet walls in cement mortar (1:3) mixed with liquid WPCas per manufacturers instructions.complete all as specified and as directed by Engineer-in-Charge. Note :- Liquid wpcshall be measured and paid separately under appropiate item of this BOQ. |
| 20 | Material and labour for applying a coat of bitumenous primer confirming to IS-3384-1986 @ 0.40 ltrs/Sqm on prepared surfaces and allow to dry complete all as specified and as directed by Engineer-in-Charge. . |
| 21 | Material and labour for APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric ( wt. not less than 150 gms/sqm ) land on primed surface by forced application complete all as specified and as directed by Engineer-in-Charge. |
| 22 | Material and labour for cement concrete tiles with grey cement and no pigmen 25cm x 25cm x 22mm thick, machine pressed; set jointed and pointed in neat cement slurry in floors over roof laid over and including 15mm thick screed bed in cement mortar 1:6and filling the joints in cement mortar 1:3 complete all as specified and as directed. |
| 23 | Material and labour for cement concrete type B-0, 1:2:4 using 12.5mm graded stone aggregates, steps; seismic and other similar bands, plinth courses, string courses, parapets and copings, kneelers, apex stones, bed plates, kerbs , water troughs and the like including weathering, slightly rounded or chamfered angles and throating complete all specified and as directed. |