| 1 | Dismantling/taking out non clogg submersible sewage pump set complete 7.5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed. Note : 1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shalldeemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump.3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. |
| 2 | Dismantling/taking out non clogg submersible sewage pump set complete 5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed. Note : 1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shalldeemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump. 3. The contractor should get the repairing work done at the installation in presence of MES rep and only the rewinding and rotor job to be done outside defence land. |
| 3 | M & L for rewinding to motor stator winding of capacity 7.5 HP non-clog submersible pump set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for \"F\" class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed |
| 4 | M & L rewinding to motor stator winding of capacity 5 HP non-clog submersible pump set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for \"F\" class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed |
| 5 | Dismantling / taking out non clog centrifugal/monoblock sewage pump set complete 5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gasket/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part complete all as directed and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.Note:- 1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shalldeemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump.3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. |
| 6 | Dismantling/taking out non clog centrifugal/monoblock sewage pump set complete 7.5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gasket/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part complete all as directed and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.Note:-1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shalldeemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump. 3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. |
| 7 | Dismantling/taking out non clog centrifugal/monoblock sewage pump set complete 12 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gasket/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part complete all as directed and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.Note:- Rates for making arrangement for lifting up the non clogg sewage pump from inside well shalldeemed to be included in quoted rates.2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump.3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. |
| 8 | M & L for Dismantling/taking out motor stator for rewinding of capacity 5 HP motor of monoblock set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for \"F\" class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed. |
| 9 | M & L for Dismantling/taking out motor stator for rewinding of capacity 7.5 HP motor of monoblock set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for \"F\" class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed. |
| 10 | M & L for Dismantling/taking out motor stator for rewinding of capacity 12 HP motor of monoblock set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for \"F\" class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed. |
| 11 | Material and Labour for dismantling the Blower unit complete from MAP STP and carrying out repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of blower oil heavy grade, greasing of bearing, replacement of gaskit, mechanical seal, rotor job etc complete all as directed and reassembling, testing & commissioning complete all as specified and directed.Note:- Once the blower unit repaired, the contractor shallremain responsible for proper functioning of blower assembly. |
| 12 | M & L for Dismantling/taking out blower motor for rewinding of capacity 10 HP motor of3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for \"F\" class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed. |
| 13 | Dismantling/ taking out non clogg submersible Arreator pump set complete of capacity 7.5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gasket/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part complete all as directed and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.Note:- 1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump. |
| 14 | M & L for Dismantling/taking out to motor stator for rewinding of capacity 7.5 HP submersible Arreator pump set 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for \"F\" class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM complete all as specified and directed. |
| 15 | Repair and servicing of 2 Hp motor of clarisetteler 3 phase 415 volt providing insulation including tightening of chain mechanism, varnishing, heating, replacement of suitable bearing, seals, gaskets, worn out carbon brushes, rotor job, couplings or any other part etc complete testing all as required for completion of JOB.Note: 1. Rates for making arrangement for lifting up motor from site shall be deemed included in quoted rates. 2. Once the motor repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor. |
| 16 | M & L for Cleaning of sewage incoming well of size 22 Ft X 22 Ft and depth 28Ftlocated at sewage treatment plant with man power and T&P (Tools and plants) such as pump set for De-watering and cleaning upto bottom of the well with all complete safety equipment and lifting of sludge by means of Hydra and taking out all clay/sludge/mud/stone pieces and other material deposited in the sewage well during course of time and removing deposited material to a distance from 50 mtr of the site of the well complete all as specified and directed. (At Mallahar camp)Note: (i)Rates for arranging machineries for carrying out the job deemed to be included in quoted rates. |
| 17 | Material and labour for removing the old gravels and sand from sand filter and old activated carbon from carbon filter, cleaning the vessels from inside complete and supply and set as per belowBottom layer: 100mm thick of gravel of 20-40 mm nominal size.Third layer : 100mm thick of gravel of 12-20 mm nominal size.Second layer: 100mm thick of gravel of 2-6 mm nominal size.Top layer : 150mm thick of silica sand (1-2 mm size.)Activated Carbon : As per Site requirment. Note: Work for Sand filter and carbon filter vessels are considered in single job. |
| 18 | Supply of polyelectrolyte chemical for disinfection of raw sewage water, ISI marked complete all as specified and directed. |
| 19 | Supply of alum (Aluminium Sulphate) chemical for disinfection of raw sewage water, ISI marked complete all as specified and directed. |
| 20 | Supply only Calcium Hypo chloride granuller typeGrade 1, Available Chlorine (min.): 65-70% ) chlorination of RO water, ISI marked complete all as specified and directed..Make AquafitNotes :-i.Test certificate showing chlorine percentage must be produced by the contractor at the time of delivery of chemical. ii. Chemical must be procured as per the site requirment and as per the date of mfg and expiry date and contractor shall remain responsible for delivering the same at various pockets at his own cost.iii. Container of 35 Ltr shall be required. Note for item Nos 18, 19 &20All material supplied by the contractor against these items will be taken on charge by the concerned Engineer-in-Charge. RV for the same duly verified by the AO shall be submitted for any payment. |
| 21 | Supply and fix in repair of bellow type PVC flexible pipe (heavy duty) of size 80 mm dia for sewage system, ISI marked complete all as specified and directed. |
| 22 | Supply and fix in repair butterfly valve stainless steel shaft and CI body with cruch handle, PN-1.0 of following sizes :- |
| 23 | 80mm Size |
| 24 | 100mm Size |
| 25 | Supply and fix in repair pressure gauge 0-4 kg/cm²/0-60 Psi SS316 existing at site analog type complete all as specified and directed. |
| 26 | Supply and fix in repair pressure gauge 0-60 kg/cm² SS316 existing at site analog type complete all as specified and directed. |
| 27 | Supply and laying MS Pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings/Sewage well etc of following sizes including taking down old unservicable existing pipe complete all as specified and directed.Note: i. Fixing/laying includes welding works as persite requirement.ii.The rates of proper welding in and including flanges and smoothing the surface deemed included in quoted rates. |
| 28 | 80 mm bore size |
| 29 | 100 mm bore size |
| 30 | S&F in repairs Dosing Pump, Capacity: 5.76 lph, Pressure: 10 kg/cm2, Make: Unichlor, Declibec,Milton Ray Type: Electronic, MoC of Head: PP, Mounting: Top Mounted, PowerSupply: 240 V Ac. Single - Phase , 54 W with standard accessory complete all as specified and directed. |
| 31 | Supply and laying or fixing or passing through pipe 1100 volts grade heavy duty submersible cable with PVC insulated 4 sqmm 3 core copper conductor unarmoured including connections including taking down old unservicable cable complete all as specified and directed. |
| 32 | S&F in repair of HDPE pipe PE 100 PN 8 as per IS 4984 complete of size 100mm dia complete all as specified and directed. |
| 33 | S&F in repair of GI pipe of \"Medium grade\" of size 50 mm with all fitting, laid in trenches complete all as specified and directed. |
| 34 | M & L for testing of water sample at authorised government laboratory for BOD and COD of waterincluding glass bottle for collection of sample. Note: Sample of water to be collected from wherever directed by Engr-In-Charge shall be the responsibility of contractor.(Water sample to be taken from MakarpuraSTP) |
| 35 | Supply and fix in repair single phase preventor suitable for 3 phase motor of any make any size all as per sample complete all as specified and directed. |
| 36 | M&L for oiling and greasing of pump motor parts (any make any size) by means of greasing gun or manually by unbolting and separating the pump motor set complete for smooth operation of machinery complete making it leakage free and applying galnd packing of necessary quantity and making working noise and leakage free complete all as specified and directed. |
| 37 | Supply and laying or fixing or passing through pipe, 1100 volts grade heavy duty roundcable with PVC insulated copper conductor served with an inner sheathing of PVC tapeunarmouredoverall PVC sheathed 6 sq. mm nominal cross section 4 Core solid conductor including taking out old unservicable exising cable complete all as specified and directed. |
| 38 | M&L for earthing complete with galvanised steel earth plate, electrode, 600x600x6.0 mm thick burried directly in ground (earth pit not less than 2.25m deep below normal ground level) connected to galvanised earth lead wire 4.0 mm dia by means of nuts, bolts, & washers of GI as shown in electrical plate No. 3 of SSR Part-I. Connected to earthing test point all as specified and including necessary earth pit PCC 1:3:6 chamber be 50mm thick PCC 1:2:4 chamber cover with 6mm dia mild steel reinforcement of 10 cm c/c spacing both ways in lieu of CI cover, watering arrangement shall be made with GI pipe light grade of 20mm dia including funnel and protection to earth lead shall be provided with GI pipe light grade 15mm dia upto 7.5 from the earth plate electrode & refillling of soil etc including necessary excavation & earth work in any strata and PCC chamber complete all as specified and directed including demolishion of old and unservicableexisting earth pit and removing from site . |
| 39 | M & L for Framed work for foundation frame of motors using angle or other section with gasket plates, rails,braces, etc., complete, drilled for fixing of steel sheeting or other covering. Doors, etc. to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering,running rails and guides) and hanging; also fastening and fixing complete with locking arrangement complete all as specified anddirected. |
| 40 | Supply and fixing of PVC water tank of heavy duty tripple layers at exsisting placeof capacity 200 Ltr incl fixing of nacessary arrangement such as inlet and outlet water connections of suitable size of pipes including dismantling of old one complete all as specified and directed. |
| 41 | S & Ffan belt for compressor to motor of suitable size and type complete all asspecified and directed. |
| 42 | M & L for cleaning of STP area by cleaning of grass, shrubs, bushes including cutting of tree branches wherever required,complete all as specified and directed. |
| 43 | M&L for Periodical maintenance of non clog submersible pump capacity 5HP/7.5 HP by cleaning of pump impeller /cutter lubricating all movable part includingtaking out from seawage collection tank and refixing complete all as specified and directed.Note:- Periodical maintenance shall be carried out in every 15 day. One periodical maintenance shall be measured as one job. |
| 44 | M&L for Periodical maintenance of non clog monoblock / centrifugalpump capacity 5HP/7.5 HP cleaning of pump impeller /cutter lubricating all movable part at site in seawage well complete all as specified and directed.Note:-Periodical maintenance shall be carried out in every 15 day. One periodical maintenance shall be measured as one job. |
| 45 | Supply and fix accessories, CI specials confirming to IS 1578 of 1970(any type radius and angle) such as bends, tapers, straight, increasing / decreasing or double socket / flanged end collars, connecting pieces etc, as required at site and for the folowing sizes all as specified and as directed upto 200mm bore. |
| 46 | S & Fball brass valves suitable for 20 mm bore pipe, high pressure, with polythene float and flynut complete, screwed for iron pipe or brass ferrule and fixed complete all as specified and directed. |
| 47 | Supply and fix PVC container 100 Ltr capacity complete all as specified and directed |
| 48 | Supply and fix in replacement with \"Ö\"ring 5 micron sediments filter (size 2.5\"x 20 \"long) PP wound (XTL 5 C20) complete all as specified and directed |
| 49 | Supply and fix in repair glass tube type rota meter(20 -200 LPM) to measure liquid flow rate complete all as specified and directed .Make. Aster/GPC/UKL |
| 50 | Material and labour preparation by complete removing of old painted iron surface of RO plant by cleaning scrapping and applying two coats of synthetic enamel paint over a coat of primer including necessary marking complete all as specified and directed |
| 51 | Supply and fix in repair of MS butter fly valve /NRV IS 13095 ,PN 1.0/PN 1.0of size 80 mm diacomplete all as specified and directed (At R O Plant) |
| 52 | S & F in repair pressure guage Range ;O-400 Psi(GF), SS bourdon type 4 \" bottom connection 1/4\" BSP(M) or 3/8 BSP complete all as specified and directed. |
| 53 | Supply and fix heavy duty switch disconnector fuse assembly with fuse links ,50 Amp complete as per IS 13947 -3 and connecting up complete all as specified and directed |
| 54 | Suply and fixprogramable control L & T make and model LX7-RS232C/485,LX7 -28 ADR conn -16 DC input 12 relay out putcomplete all as specified and directed (R O plant Automationpanel) |
| 55 | M&L for repair and Maintenance of sand media filter including sand,Brabels,and gravells etc complete all as specified and directed.NOTE :- Below the items deemed to be included in quoted rate.(a) Sand size 16/32 (b) Brabels size 14/38 (c) Brabels size 4/8 (d) Gravells size 1/2\"\" (e) Gravells size 1\"\" |
| 56 | M&L for repair and Maintenance of carbon media filter including carbon 900 IV size 4/8 etc complete all as specified and directed.NOTE :- Below the items deemed to be included in quoted rate.(a) carbon 900 IV 4/8 -1000 Kg |
| 57 | Material and labour for repair / replacement of Bw 8040 membranes for R O plant 20000 litre Capacity including testing and CIP work complete all as specified and directed. |
| 58 | Supply and fix in repair of UPVC flange of 80 mm dia size complete all as specified and directed. |
| 59 | M&L for RO plant wound filters sediment filter cartridge 20micronincluding all necessary fittings and labour complete all as specified and directed.Make : GE/pure Aqua/ |
| 60 | Labour only for disconnecting and taking out existing vertical type high pressure motor pump set of 7.5 HP electric driven 3 phase 415 voltincluding Re-fixing in the same position after repair complete all as specified and directed. |
| 61 | Rewinding of 7.5 HP vertical type high pressure pump centrifugal pump (Motor) 3 phase 415 voltwith supper emamelled copper rewinding wire of suitable size/gauge and providing insulation including taking out the existing winding, varnishing, heating, replacement of suitable bearing, seals, gaskets etc complete including testing all as required for completion of JOB complete all as specified and directed. |
| 62 | Laour only for CIP of RO Plant from authrised dealer/vender and including submission of certificate and testing of water quality complete all as specified and directed. |
| 63 | Supply only the following items for day to day operation and maintenance ofRO plant :-(a) Sodium Meta Bisulphate. |
| 64 | (b) Anitscalent chemical. |
| 65 | (c) PH Correction chemical |
| 66 | (d) Descaling Chemical of safety for Membrane choking (for CIP) |
| 67 | NOTE FOR ITEM NOS 63.0 to 63.03Material supplied under these items shall be taken on charge by concerned AGE/JE and copy of RV duly verified by AO shall be submitted at the time of payment. |
| 68 | Testing of Bore well water/ Raw water/STP Water/Clear Waterto analyse the following parameters as per IS 10500:2000 through Govt. approved laboratory:-a) Physicochemical parameters of water / eflluent sampleb) Bactoriological test of water sample.c) Metals ( Except Hg, As & Se).d) Pesticides. |
| 69 | Supply only Alum Ferric of best quality in packing of 20 Kg bag complete all as specified and directed.Note: Material supplied under this items shall be taken on charge by concerned AGE/JE and copy of RV duly verified by AO shall be submitted at the time of payment. |
| 70 | Supply only Alum Non Ferric (White crystal) of best quality in packing of 5 Kg bag complete all as specified and directed.Note: Material supplied under this items shall be taken on charge by concerned AGE/JE and copy of RV duly verified by AO shall be submitted at the time of payment. |
| 71 | S&F straight plain brass ferrules (or connecting screws) screwed both ends and fixed to 200/250mm dia water pipe by proper punching & fixing including earth work all as per site requirement with testing complete all as specified and directed. |
| 72 | Excavation in trenches not exceeding 1.5m width and not exceeding 1.5 m in depth and getting out in soft/loose soil for taking up/laying cable/pipe etc complete all as apecified and directed. |
| 73 | Returning, filling in, including spreading, levelling, watering & well ramming in layers not exceeding 25cm complete all as specified and directed. |
| 74 | Removal of excavated material at a distance notexc 50 mtr and depositing where directed at a level not exc. 1.5 mtr above the starting point complete all as specified and directed. |
| 75 | M & L for run lead joint for CI/DI pipe 150/200/250 mm bore of spigot & socket connection complete all as specified and directed.Note- Excavation shall be measured and paid under respective item in this schedule. |
| 76 | M&L for Repair/rectification of leakages to water supply distribution lines 15 mm dia to 25 mm dia GI tubing with provision of necessary excavation, returning and filling in as required, tightening of loose joints of union, elbow, sockets etc, threading if required including supply and replacement of GI unions/sockets/nipples as required at site complete all as specified and directed. |
| 77 | All same as per item No 72.00 above but for GI tubing 40 mm dia to 50 mm dia complete all as specified and directed. |
| 78 | M&L for attending routine compliants of external water supply including rectification of minor defects by taking down of existing GI tubing up to 25 mm dia, cutting/threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of jumper valve/ packing sheet of gate valve and including replacement of GI unions/sockets/nipples etc as required at site complete all as specified and directed. |
| 79 | All same as per item No 74.00 above but for GI tubing 40 mm dia to 50 mm dia. |
| 80 | M & L for attending break down of water supply pipe line and repair to CI water mains of size 100 mm to 200 mm dia at a given notice including necessary excavation in mud, in any type of soil by manual or using special T &P such as JCB etc.De-watering from the trenches by using pump sets, rectification of leakages, fixing of CI specials such as collars bends/tail peaces etc and making joints complete all as specified and as directed. Note:- CI specials, lead Joints, D-Joints, Clamp joints etc shall be measured and paid under respective items of sch \"A\". |
| 81 | S&F in repair semi automatic star delta starters in sheet steel enclosure AC-3 duty, 415 V, 25 HP,with ralay range 16-25 A complete all as specified and directed. |
| 82 | S&F direct online starter for 30 HP Centrifugal Motorpump, relay range 40 to 50 Ampincluding taking down of existing old burnt startor complete all as specified and directed. |
| 83 | S&F direct online starter starter for 25 HP Centrifugal Motorpump, over load relay range 28 to 40 Ampincluding taking down of existing old burnt startor complete all as specified and directed. |
| 84 | Labour only forloweringofsummersible pump assembly after disconnecting tanking up and repairing from existing water supply pipe line and all electric connectionof30 HPmotor complete all as specified and direceted. |
| 85 | Supply only the following spares for repairs of submersible pump set of 30 HP capacity complete all as specified and directed:- |
| 86 | (a) Motor bearing bush (LB) |
| 87 | (b) Thurst bearing set |
| 88 | (c) Impeller |
| 89 | (d) Stage casing |
| 90 | (e) Section bush |
| 91 | (f) Pump NRV |
| 92 | (g) Discharge out let Bush LB |
| 93 | (h) Discharge out let. |
| 94 | (j) Middlebush LB |
| 95 | (k) SS sleeves |
| 96 | (l) Pump servicing |
| 97 | (m) Neck ring stage casing |
| 98 | (n) Sand guard |
| 99 | (o) Oil sealing |
| 100 | M&L for Repairing/ overhauling ofcentrifugal pump assembly after disconnecting existing water supply pipe line and electric connectionfrom30 HPmotor and transporting to work shop opening the pump and replacement of unserviceable worn out parts refixing ,overhaualing,reassmbling and alignment withreplacement of unserviceable parts and refixing the same back to pump house plat form including testingcomplete all as specified and directed. Note : New part of pump shall be measured and paid separately. |
| 101 | Supply only following spare part of 30 HP centrifugal pump complete all as specified and directed:- |
| 102 | Supply only Pump shaft |
| 103 | Supply only Oil seal |
| 104 | Supply only Gasket |
| 105 | Supply only Bearing |
| 106 | Supply only pump coupling |
| 107 | Supply only Terminal block |
| 108 | Supply only Impeller |
| 109 | Supplyonly PVC fan |
| 110 | Supply only Gland rope |
| 111 | M&L for Flushingof existing borewells of size 150 mm dia, 150 Mtrs depth with drilling compressorincluding surgingand flushing the bore at a pressure of 7 Kg / Sq cm complete with compressed air andflushing the sand, mud etc from the bore well till discharge of the fresh water, including testing of watersamples for chemical and bacteriological tests and yield testing for 8 hours complete all as specified and directed . |
| 112 | M&L for Rewinding the centrifugal pump motor 30 HP of any make with PVC insulated super enameled heavy duty copper winding wire of same gauge and number of turns by using minilex fiber insulating sheet and sleeves etc. complete all as specified and directed. |
| 113 | M&L for Rewinding the Submersible pump motor 30 HP of any make with PVC insulated super enameled heavy duty copper winding wire of same gauge and number of turns by using minilex fiber insulating sheet and sleeves etc.complete all as specified and directed. |
| 114 | M&L for Construction of valve pit Complete as per Chief engineer Airforce Ahmedabad Drg No. CEAA/TD/57 sheet No.1.1, Ser No.4 Type \"D\"of size 1050 x 750 x 1000mmfor 150 to 200 mm dia Sluice / Reflex valve. Complete as speccified & directed. |
| 115 | Supply, laying and testing of DI Pipes of 100 mm bore, K-7 with all fittings flange type laid in floors or fixed to walls and ceilings etc complete all as specified and directed. |
| 116 | Supply, laying and testing of DI Pipes of 150 mm bore, K-7 with all fittings flange type laid in floors or fixed to walls and ceilings etc complete all as specified and directed. |
| 117 | Labour only for Disconnecting the existing non functional submersible pump set from electric supply from panel, dismantling existing CI bend from non return valve, removing and lifting out submersible pump set of any description and capacity upto 20/15 HPandin any position, along with existing column pipe 100mm dia and existing submersible cable of any size from the bore well (approximately 450 feet depth of pump set from GL) and staking the pump and column pipes near by the bore well for inspection complete all as specified and directed.NOTE: - Contractor shall take proper precautions while lifting out and removing pump set from bore well so as to avoid any damage to column pipe and submersible cable. All necessary T&P and equipments required for lifting out pump set etc. shall be arranged by the contractor at his own cost. |
| 118 | (ii). Number of column pipe may vary from 30 to 50, The existing pipes & flanged joints shall be checked for its serviceability & unserviceable joints along with flanges shall be removed from the column pipe by cutting the pipes & making new thread in pipes for fixing of new flange joint, the cost of same shall be deemed to be included in the quoted rate for above item. However cleaning of pipes if any required shall be measured & paid separately. |
| 119 | Labour only for Lowering down of the submersible pump set of any description and any capacity upto 20/ 15 HP and in any position, in bore well along with column pipe 100 mm dia and submersiblecable of any size (approximately 450 feet depth of pump set from GL) complete all as specified and directedincluding making necessary electric connections & testing the pump set after lowering complete all as specified and directed. |
| 120 | Supply only the following items/ spare parts suitable for ACsubmersible pump set/Moter up to 20 /15 HP capacity dismantled under Schedule ‘A’ item No. 90 here in beforecomplete all as specified and directed:- |
| 121 | Cast iron stage bowl |
| 122 | Gun metal neck ring make NITCO’ or equivalent |
| 123 | Anti magnetic stainless steel pump shaft with key made : DD/’KSB or equivalent |
| 124 | Impeller gunmetal make: NITCO/ KSB or equivalent |
| 125 | Stainless steel sleeve( inlet) make : DD/KSB or equivalent |
| 126 | Stainless steel sleeve( outlet) make : DD or equivalent |
| 127 | Running bush outlet of gun metal |
| 128 | Stage bowl cover |
| 129 | Bolt stud with nut and washers |
| 130 | Running bush inletofgun metal |
| 131 | Strainer stainless steel |
| 132 | Shaft nut with washer |
| 133 | Supply only the following items/ spare parts suitable forsubmersible motor ofAC 20 HP capacity complete all as specified and directed:- |
| 134 | Connector for motor |
| 135 | Steel bolt set |
| 136 | Key for thrust plate |
| 137 | Thrust bearing[set of 02] |
| 138 | Cable pressure washer |
| 139 | Thrust plate |
| 140 | Rewinding the submersible motor 30 HP of any make with PVC insulated super enameled heavy duty copper winding wire of same gauge and number of turns by using minilex fiber insulating sheet and sleeves etc complete all as specified and directed. |
| 141 | M&Lfor fabricationof motor pumpbase and suppportingleg of various pipes etc using MS flat 25x5mmiron strip/channel/angle Ironincluding necessary cutting , welding, bending etc complete all as specified and directed. |
| 142 | M & L for Motor 7 HP vertical type high pressure motor pump set of 7.5 HP electric driven 3 phase 415 voltincludingdisconnecting and taking out existing and testing complete all as specified and directed. |
| 143 | S&F chemical feed dozer motor operated suitable for mixing hypochloride of capacity 100 ltr tankwith stroke adjustment of 0 to 6 LPH complete with fittings and piping all as specified and directed. |
| 144 | M&Lfor foot valve of size 100 mm fixed in sump complete all as specified and directed. |
| 145 | Supply & fix SS Spindle CI sluice valve PN 1.6, long body, confirming to IS- 14846 : 2000.Complete and testing all as specified and as directed by the Engineer-in-Charge including dismantling of sluice valve of following sizes:- |
| 146 | 150 mm bore sluice valve |
| 147 | 100 mm bore sluice valve |
| 148 | Note for all items :- If any item gets repeated in this schedule, the lowest rate quoted for those same items by the L-1 bidder shall be considered for payment and decision of Accepting Officer i.e. GE(AF) Baroda in this regard shall be final and binding. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail