| 1 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50metres lead : |
| 2 | Thickness above 25 mm up to 40 mm |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 4 | Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: |
| 5 | (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. |
| 6 | (b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. |
| 7 | (c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing. The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium items. |
| 8 | The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approvedshop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places. |
| 9 | 15 mm cement plaster on rough side of single or half brick wall of mix : |
| 10 | 1:6 (1 cement: 6 coarse sand) |
| 11 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound ) content less than 50 gram/ litre, of approved brand and of required shade and colour complete to give and even shade. |
| 12 | Old work (one or more coats) |
| 13 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. |
| 14 | With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre. |
| 15 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 16 | One or more coats on old work. |
| 17 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-harge. |
| 18 | With cement mortar 1:4 (1cement: 4 coarse sand). |
| 19 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. Note - item to be applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor vehicle of 3.5 cum or more. |
| 20 | Supplying and fixing Granite stone of size (3\"00\" x 2\"00\") 18 mm thickness with border rounded edged of required size including engraving the inaugeration details in Golden inked letter of required size and fonts, all complete at site as per direction of Engineer in charge. Item includes supplying 100 mm wide teakwood beading alround the stone and fixing with Adhesive (Areldite etc...) |
| 21 | Supplying and fixing powder coated Aluminium channelwith bracketsofsize 5\"00\" with sliding arrangement for curtain of 5\"00\" x 3\"00\" of approved design quality and shade over the inaugeration stone including removal of same after inaugeration, all complete at site as per direction of Engineer in charge. |