| 1 | Earth work in correcting section of canal including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 2 | Dismantling of Brick Work with lime/cement mortar and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 3 | Dismantling of Reinforcement Cement Concrete work and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 4 | Earth work in excavation in foundation in all type of soil with all lead and lift including back-filling the trench with proper disposal, ramming and dressing required for proper completion of work for VRB. |
| 5 | Centering and shuttering for Plain Cement Concrete work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. |
| 6 | Plain Cement Concrete in 1:3:6 with Cement, Coarse Sand & crushed stone grit including cost of all materials, labour and T&P with proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications. |
| 7 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. |
| 8 | Providing and laying Steel as Reinforcement including cost of steel, carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. |
| 9 | Supplying and Fixing PVC Pipe of 75 mm dia including cost of pipe, other material, labour, T&P etc. required for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. |
| 10 | Reinforced cement concrete in M25 Grade of Concrete with Coarse sand, Crushed Stone Aggregate, Mechanically mixed, properly compacted and placed in proper position including cost of all materials (but excluding cost of steel), inucluding labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.(Design mix Concrete.) |
| 11 | Supplying and laying of Joint Filler Board including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. |
| 12 | Brick on edge soling with 1st class brick including preparation of sub-grade to prescribed camber, filling joint with Local sand including cost of material, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 13 | Brick on edge soling with 1st class brick including preparation of sub-grade to prescribed camber, filling joint with Local sand including cost of material, labour and T&P etc.(reuse of brick from diversion in approach road)60% Brick of diversion should be reusable in approach road. |
| 14 | Making and Fixing of Wheel Guard Stone including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 15 | Sing board at site for notice both side including Painting & Letter writing cost of all material ,labour, t&p etc. required for proper completion of worK. |
| 16 | Boring with 150 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. required for proper completion of work as directed by Engineer-in-Charge as per I.D. specifications. |
| 17 | Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge as per I.D.specifications. |
| 18 | Earth work for making Diversion including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and I.D. specification. |
| 19 | Making cut-off wall with dismantled brick for protection work including cost of all material,labour,T&P etc. required for proper completion of work as I.D. specification. |
| 20 | Laying pitching with dismantled material for protection work including cost of all material,labour,T&P etc. required for proper completion of work as I.D. specification. |
| 21 | Finishing wall with acrylic smooth exterior paint of required shade including cost of all materials, labour and T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 22 | Providing one coat of VG -30 bitumen painting with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. Slab including cost of all material labour and T & P etc. |
| 23 | S/Laying of Geo Taxtile (sheet) made of 240 gsm woven multifilament polypropylene yran including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.specification. |
| 24 | Earth work in removing of diversion bund and using for making ramp including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and I.D. specification. |
| 25 | Earth work in excavation in canal internal for cut off wall in all type of soil with all lead & lift including backfilling with proper disposal & dressing required for proper completion of work. |
| 26 | Earth work in excavation including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work Outlet & Boundry Pilllar as directed by Engineer-in-Charge and as per I.D. specifications. |
| 27 | Providing & Laying LDPE Sheet including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 28 | Making and Fixing of RCC Pre-cast boundry Pillar including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 29 | Plain Cement Concrete in M15 Grade of Concrete with Cement, Coarse Sand & crushed stone grit including cost of all materials, labour and T&P with proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications. |
| 30 | Laying RCC work in 1:1.5:3 (M-20) in foundation with cement, coarse sand & stone grit (10mm to 20mm.) including all cost of materials, carraige upto site of work, T&P and labours required for proper completion of work. |
| 31 | Writing letter for details of canal Boundary Pillars including all cost of material, labour, T&Petc. proper completion of work. |
| 32 | Supply and fixing HDPE Kulawa Pipe 110 mm dia (4\") including labour, T&P etc. required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 33 | Supply and fixing HDPE Kulawa Pipe 160 mm dia (6\") including labour, T&P etc. required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 34 | Supply and fixing HDPE Kulawa Pipe 180 mm dia including labour, T&P etc. required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 35 | Ist Class Brick Masonary work in 1:4 with Cement and Corse Sand including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. |
| 36 | Struck deep Cement Pointing in 1:2 Cement Mortar including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 37 | Cement concrete in M20 Grade of Concrete with Coarse sand, Crushed Stone Aggregate, Mechanically mixed, properly compacted and placed in proper position including cost of all materials inucluding labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. |
| 38 | Erection of fabrication charges of gate and gate parts. (Material and labour.) |
| 39 | Lifting mechanism Assembly Repairing charge etc. |
| 40 | Painting with synthetic enamel paint of required colour to give an even shade with Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture including cost of all materials, labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specifications. |
| 41 | Greasing & oiling of Head regulator including cost of all material, labour& T&P etc. complete |
| 42 | Rubber Seal Please Enable Macros to View BoQ information |