| 1 | Supply, installation,testing and commissioning ofoutdoor type LT Panel for power distribution as per Technical document NO. TS 01. |
| 2 | Supply, installation,testing and commissioning of 3.5 C X 240 Sq. mm AL XLPE LT Cable as per Specification Document TS 02. |
| 3 | End terminations of LT Cable: 3.5 C X 240 Sq. mmAluminium conductor as per Specification document no. TS 03. |
| 4 | Supply, installation,testing and commissioning of area lighting fixture along with wiringas per Technical document NO. TS 04. |
| 5 | Supply, installation,testing and commissioning of4 C X 25 Sq mm Copper XLPE Cable along with wiringas per Techhnical document NO. TS 04-A. |
| 6 | End terminations of LT Cable: 4 C X 25 Sq. mmCopper conductor as per Specification document no. TS 03-A. |
| 7 | Excavation and Back filling with disposal of excess earth as directed by Engineer-in-Charge as per Specification document no. TS 05 |
| 8 | PCC Work as per Specification document No. TS 06 |
| 9 | RCC Work as per Specification document No. TS 07 |
| 10 | Brick Protection of LT cableas per Specification document No. TS 08 |
| 11 | Brick work as per Specification document No. TS 09 |
| 12 | Cable Route Marker as per Specification dcoument No. TS 10 |
| 13 | 600X 600 mm X 3 mm Copper Plate earthing as per Specification document No TS 11. |
| 14 | 25 X 3mm GI Strip for earthing connections as per Specification document No TS 12. |
| 15 | Insulating Mats-Supply of fine ribbed electrically tested safety matting of size is 1mtsX1mts as per following specification document No TS 13. |
| 16 | Outdoor type DBwith incomer 63 A MCB, RCCB -63 A, 30 ma, 16 A outgoing MCBsand timer circuit for area light as per Technical Specification Document No.TS 14. |
| 17 | Supply, installation and layingof non pressure 150 mm DiaNP2 class RCC Hume pipes ofreputed make, with collars jointed with stiff mixture of cement mortar in the proportion of 1:2, laying to the levels, slopes and as per the drawings and specifications and as directed by the Engineer-in-charge including testing of joints etc. complete. |
| 18 | Auger boring to required diameter under existing BT Road crossing approx ranging 6 mtr to 25 mtr length at various locations at BARC main site to insert HDPE pipe as casing pipe of 250mm dia suitable to encapsule 150 mm dia MS pipes. This work includes underground boring below the existing BT road ( Approx 1.2 mtr from the existing BT road Top level). |