| 1 | Construction of Reference & Working Benchmark = 1 Nos & 2 Nos Respectively |
| 2 | Construction of Reference Pillars/Burjees = 16 Nos |
| 3 | Clearing and Grubbing Road LandClearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I ( By |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and300.2 with a lead upto 1000 m as per TechnicalSpecification Clause 301.5 |
| 5 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and300.2 with a lead upto 100 m as per TechnicalSpecification Clause 301.5 |
| 6 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality& Labour Cess). |
| 7 | Granular Sub-base with Well Graded Material (Table 400.1) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per TechnicalSpecification Clause 401. (For Grading II Material) |
| 8 | WBM Grading 3 :-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per |
| 9 | Prime Coat (Low Porosity) :- Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0kg/sqm using mechanical means as per TechnicalSpecification Clause 502 |
| 10 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to0.30 kg per sqm on the prepared granular surface tretaedwith Primer and clened with hydriloc broom as per technical specification aclouse 503. |
| 11 | Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per |
| 12 | Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,usingcuring compound (where specified) and water finishing |
| 13 | Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as perdrawing and Technical Specification Clause 1703 |
| 14 | Ordinary Kilometer Stone (Precast) |
| 15 | 200 m stone (precast) |
| 16 | Gaurd Wall :- Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and TechnicalSpecification Clause 1704 |
| 17 | Providing and Fixing \"Logo\" of MMGSY Project :-Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701and Annexure 1700.1 |
| 18 | Providing and fixing of retro reflective cautionary , mandatory and informatory sign board as per IRC :67 made of 1.5 mm thick MS steel duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figureswith reflective tape engineering grade as per clause 1701.3.9 of MORD for rural road of required shade and colour supported and welded on 47mmx47mmx12swg sheet tube firmly fixed to the ground by mean ofproperly designed foundation with M15 grade cement concrete 450x450x600 mm ,600mm below ground level as per |
| 19 | 600 mm circular , OR |
| 20 | 600 mm equilateral & triangle, OR |
| 21 | 600 mm x 450 mm rectangular, OR |
| 22 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface :- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level,uniform and free from streaks and holes. |
| 23 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Conctete Surface:- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level,uniform and free from streaks and holes. |
| 24 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203RCC M-20 Grade |
| 25 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technicalspecifications Clauses 1000 and 1202 |
| 26 | Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technicalspecification clause 1104 |
| 27 | Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,1202 & 1203 |
| 28 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M15(PCC 1:2.5:5)) |
| 29 | Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection works,backfilling concrete and masonary works in head walls and parapets as per clause1106 |
| 30 | Painting on Parapet Wall (Black & White Strips) Painting two coatsincluding primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing andTechnical Specification Clause 1701 |
| 31 | Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom andbackfilling in trenches with excavated suitablematerial. |
| 32 | Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specificationClause 1108 |
| 33 | Providing PCC M-20 :--Providing PCC M 20 concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,1202 & 1203. |
| 34 | Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concretein Abutement cap complete as per drawings and technicalspecifications Clause 802, 803, 1202 & 1203 |
| 35 | Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specificationsClauses 1002, 1010 and 1202 |
| 36 | Add 1% Labour Cess |
| 37 | Seigniorage Fee |
| 38 | Add 18% GST |
| 39 | 1st Year Maintenance cost |
| 40 | 2nd Year Maintenance cost |
| 41 | 3rd Year Maintenance cost |
| 42 | 4th Year Maintenance cost |
| 43 | 5th Year Maintenance cost |
| 44 | Add 1% Labour Cess |
| 45 | Seigniorage Fee |
| 46 | Add 18% GST |