| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. In Ground Floor |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. upto 150 mm thick. In Ground Floor |
| 3 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m including stacking of steel bars. In ground floor including roof. In Ground Floor |
| 4 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1500 mm. |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation of foundation. |
| 6 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity) |
| 7 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 8 | Brick work with 1st class bricks in cement mortar (1:6). In foundation and plinth. |
| 9 | 125 mm thick brick work with 1st class bricks in cement mortar (1:4) . In ground floor |
| 10 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, as per relevant IS codes. Pakur variety. In Ground Floor |
| 11 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety. In Ground Floor |
| 12 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor - Pakur variety - 1:3:6 proportion. |
| 13 | Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. |
| 14 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works. 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 15 | 25 mm to 30 mm shuttering without staging in foundation. |
| 16 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor / upto 4 m. Tor steel.SAIL/TATA/RINL .In Ground Floor |
| 17 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS:226, IS:808 & SP(6)-1964 connected to one another with bracket, gusSets, cleats as per design, direction of Engineer-in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS:816-1956 & IS:1995 using electrodes of approved make and brand conforming to IS:814-1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. For structural members of specified sections weighing less than 22.5 kg/m may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for EA additional floor or 4m. beyond initial 8m. or part thereof. For structural members of specified sections weighing less than 22.5 Kg./m |
| 18 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar,..With 1:6 cement mortar 15 mm thick plaster |
| 19 | Neat cement punning about 1.5 mm thick in wall, dado, window sill, floor etc. Note - Cement 0.152 CuM per 100 SqM. |
| 20 | Supplying & laying 20 mm designer chequered tiles of any shade and of approved quality as per IS: 1237: 1980 laid in patterns as directed in pavement, footpath including necessary underlay 25 mm thick average cement mortar (1:3) complete in all respect with all labour and materials [using cement slurry @ 4.4 kg/Sq.m at back side of tiles. Cement of mortar & slurry will be supplied by the Department. Border concrete if necessary to be paid separately]. |
| 21 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On steel or other metal surface - With super gloss (hi-gloss) - Two coats (with any shade except white) |
| 22 | Labour charge for collecting of existing gravels from switchyard premises and stacking the same within a lead of 75 meter within the Sub-Station area, screening washing the gravels and cleaning the switchyard from plants, jungle, shurbs, mud, slurry etc and respreading the same gravels over the switchyard premises. (Anayzed Rate). Analysis Attacthed. |
| 23 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. Please Enable Macros to View BoQ information |