| 1 | Hot water generator (Boiler) of Heat Output 4,00,000 Kcal/hr complete with fuel burner, chimney, safety valves & all other standard accessories as pertechnical specification. |
| 2 | Horizontal Split Casing Centrifugal pump of 550 LPM & 30 m Head capacity as per technical specification. |
| 3 | Oil Pump suitable to Boiler under item 1 as per technical specification. |
| 4 | GI ERW class C pipes of following nominal diametersuitable for hot water application complete with glasswool insulation and aluminium cladding as pertechnical Specification. |
| 5 | 200 mm |
| 6 | 125 mm |
| 7 | 80 mm |
| 8 | 50 mm |
| 9 | 25 mm |
| 10 | Globe valve of size 125 MM dia. suitable for hot water application complete with counter flanges for flanged valves as per technical specification. |
| 11 | Gate valves of size 125 MM dia. suitable for hot water application complete with counter flanges for flanged valves as per technical specification. |
| 12 | Non Return valves of size 125 MM dia. suitable for hot water application complete with counter flanges for flanged valves as per technical specification of the tender. |
| 13 | Y type Strainer of size 125 MM dia. suitable for hot water application complete with counter flanges as per technical specification. |
| 14 | Air vent of 1/2 inch dia. & as per Technical Specifications. |
| 15 | Gate valves of size 25 mm dia. having brass metal as material of construction & as per technical specification. |
| 16 | Pressure guage of 100 mm dia size, range 0 to 10 kg /sq. cm & as per technical specification. |
| 17 | Temperature gauge of 100 mm dia sizeas per technical specification |
| 18 | Construction of PCC foundation for boilers and other equipments as per site condition as per technical specification. |
| 19 | Breaking of PCC foundation and shifting of debis from working site to suitable location as per technical specification. |
| 20 | Submersible pump set of 100 mm dia. in bore well of Flow rate 80 LPM at 180 meter head of water column as per technical specification. |
| 21 | Starter panel for submersible pump set in item no. 15 along with suitable power cable & as per technical specification. |
| 22 | Dismantling Work of old equipments : Old hot water generator (Boiler), pumps, piping etc in plant room area and shifting to suitable location as directed by EIC & as per technical specification. |
| 23 | MS Structure including angles, channels etc for providing support & framework along with its painting as per technical specification. |
| 24 | Electrical panel complete with starter for motors, interlocks, MCCBs, controller etc as pertechnical specification. |
| 25 | Non-Return Damper (Gravity based) for flue gases pathway of Boilers Chimney as per technical specification. |
| 26 | Descaling of pipeline as per technical specification. |
| 27 | 1.5 TR capacity split ACs for cooling of rooms complete with indoor & outdoor unit with standard refrigerant piping & cabling & all other standard accessoriesas per technical specification. |
| 28 | Copper Tubing set along with cablingas per technical specification. |
| 29 | Integration of plant room equipment with existing piping network, testing of entire network and commissioning of complete systemas per technical specification. |
| 30 | Operation of Boilers as per technical specification. |