| 1 | Composite item for Renovation of Footpath and Construction of Toe Wall, Side Drain, Hand Railing, Covering Slab comprising Earthwork in excavation by mechanical or manual means in foundation trenches or drains in all kinds of soil, including dressing of sides, ramming of bottoms, lifting, and disposal of surplus soil within a lead of 50 m; centering and shuttering with strutting and propping and removal of formwork for foundations, footings, retaining and other walls, suspended floors, roofs, landings, balconies, and access platforms; providing and laying plain cement concrete up to plinth level and reinforced cement concrete at plinth and superstructure levels in specified mixes, excluding centering, shuttering, finishing, and reinforcement; steel reinforcement for RCC works up to plinth level using TMT Fe-500D bars; 12 mm thick cement plaster in 1:4 mix; extra for chequered finish on concrete floors and steps; and structural steel work in welded built-up or framed sections including cutting, hoisting, fixing, and priming for gratings, frames, railings, ladders, gates, and similar works., complete as per the direction of Engineer-in-Charge and as per the site condition for a length of New Footpath-18mtrs and 1.00 width, Side Drain 36mtrs and 0.60 width, Toe Wall- 40 mtrs and 1.20 mtrs height, Renovation of Old Footpath- 38 mtrs and 2.00 mtrs width.Note: The work shall further include submission of calculations and detailed design drawing with the Technical Bid. The detailed drawings shall comprise plan, elevation, sections and construction details prepared as per the site conditions and shall be duly signed and vetted by a registered engineer.The entire work shall be executed complete in all respects on a lumpsum basis. |