|
| 1 | Cleaning of septic tankofany capacity by mechnical means including vaccume suction,taking off suitable capacity fitted with vaccume sunction pump of capacity not less than 15 cum/hr and deposited the sludge and water outside the MOD landcomplete all as specified and directed. |
| 2 | Cleaning of blockage of gully traps, Nahani traps, Floor traps incl removing gratings and re-fixing old or new gratings with white cement complete all as specified and directed. |
| 3 | M&L for cleaning of sewage line SWG/CI pipe/ RCC pipe/PVC pipe etc vertically/horizontally of dia n.exc 200mm by rodding and well flushing by using sufficient water and making itclear for easy flow of sewage from WC, gully trap, Nahani trap etc upto the first manhole including desludging of first manhole and making it the proper functional to entire satisfaction of Engineer-in-Charge and removing the sludge, silt away from Bldgs etc upto a distance exc 50 m and n.exc 500 m and burying it in pits and covered with earth complete all as specified and directed. |
| 4 | Note for item No. 2 &3 :-1 Contractor may have to deploy more manpower in the particular area including all necessary T&P / equipmen to resolve the complaintwithin 06 hours of complaint received (on same day). 2.In case contractor fails to get the complaint rectified within 06 hours of complaint received, he shall be penalised for the same at a flat rate of Rs 200/- per complaint , in addition to cost incurred by the department for rectification of complaints from third party. 3. Proper records (date wise) of complaints received & rectified by the contractor shall be maintained and shall be produced for verification at the time of payment of each RAR/Bill. |
| 5 | All as per Srl item No 03 here -in-before but length of sewage line cleaned manhole to manhole complete by rodding and well flushing with sufficient water, length of sewage line upto 10 M including desludging of both sides existing manholes complete all as specified and directed. |
| 6 | All as per Srl item No 03 here -in-before but length of sewage line cleaned exc 10 M but n.exc 25 M from manhole to manhole including desludging of both sides existing manholes complete all as specified and directed. |
| 7 | Dewatering of septic tank of any dia and depth completely by pumping out the water and removing it to nearby nala where directed complete all as specified and directed. |
| 8 | Cleaning of man holes of any size and depth by any means and getting out sludge and water and removing to a distance upto 100 mtr and burried into pits covered with 20cm thick soil complete all as specified and directed. |
| 9 | Taking down old unservicable SWR pipe of any dia including fittings complete all as specified and directed |
| 10 | S&F 110 mm dia PVC(SWR) pipes single soketed in any length with adhesive jointed fixed to wall with mild steel clampscomplete all as specified and directed. |
| 11 | All as per Srlitem No 9 here -in-before but laid in trenches or in floors complete all as specified and directed |
| 12 | S&F in PVC (SWR) bends 110 mm dia complete all as specified and directed. |
| 13 | S&Fin repairs PVC (SWR) bendsof bore 110mm with acess door complete all as specified and directed. |
| 14 | S&F in repairPVC (SWR) junction single ( single T ) equal or unequal 110mmdia complete all as specified and directed. |
| 15 | S&F in repair PVC (SWR) 110 mm diajunction, with acess door single(single \"T\")equal or unequal complete all as specified and directed . |
| 16 | S&F PVC (SWR) vent cowl 110mm dia complete all as specified and directed. |
| 17 | S&F 75 mm dia PVC(SWR) pipes single soketed in any length with adhesive jointed fixed to wall with mild steel clampscomplete all as specified and directed. |
| 18 | All as per Srlitem No 16 here -in-before but laid in trenches or in floors complete all as specified and directed.. |
| 19 | S&FPVC (SWR) bends 75mm dia complete all as specified and directed. |
| 20 | S&F in repair PVC (SWR) bends 75mm dia with acess doorcomplete all as specified and directed. |
| 21 | S&F in repair for 75 mm dia PVC ( SWR) floor trap with grating including jointing with solvant cement including PCC 1:2:4 and making good the existing floor complete all as specified and directed. |
| 22 | Demolition of brick work or rubbled stone masonry including all qoins arches , pillars etc built in cement mortar complete all as specified and directed. |
| 23 | M&L for brickwork with subclass \"B\" old size bricks, straright or curved on plan exc 6m mean radius built in Cement mortar 1:4 using bricksof crushing strength not less then 35 Kg/cm2complete all as specified and directed. |
| 24 | M&L forbrick work with sub class \"B\" brick (old size), in cement mortar 1:4, straight or curved on plan to any radius in half brick thick wall complete all as specified & directed. |
| 25 | M&L Brick work with subclass \"B\" bricks in one brick thick honey comb walling built in CM 1:4 complete all as per specified and directed. |
| 26 | M&L Brick batsusingsubclass \"B\" bricks for loose filling in soak wells etccomplete all as per specified and directed. |
| 27 | M&L cutting into existing manholes for (dia 150mm / 200mm) connecting new or old drains making good to pipes and rendering,cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B1 smooth finished, and reforming benching as required all as specified and directed |
| 28 | Demolition of RCC of roof, beams, landing, chajja, cover slabsand similarsuspended work complete all as specified and directed. |
| 29 | M&L forRCC 1:2:4 type B-1 (using 20mm graded stone aggregates) as in slabs supported on walls as in soak well and septic tank etc complete all as specified and directed. |
| 30 | M&Lfor form work to soffits of suspended slabs such as flator curved roof slabs, floor slabsn exc 200mm thick finished fair or curved concrete surface complete all as specified and directed.. |
| 31 | M&Lfor form work to edges of concrete flats, treads breaks in floors, window cills, concrete railings, openings in concrete walls, floor and roofs not exc 10cm wide and sides of RCC / PCC bandsin walls, horizontal or slopping and similar worksfair finished concrete surface complete allas specified and directed.. |
| 32 | M&L for mild steel TMT bars10mmdia and overcut tolength, bent to shape required, including cranking, bending spirally for hooping for columns, hooking for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips quality conforming toGde Fe complete all as specified and directed. |
| 33 | M&L for mild steel TMT bars6 to 8 mmdia cut tolength, bent to shape required, including cranking, bending spirally for hooping for columns, hooking for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips quality conforming to Gde Fe complete all as specified and directed. |
| 34 | M&L for mild steel round bars 10mm dia & over,cut to length, bent to shape required, including cranking, bending as in manhole covers handles, steps, rungs etc complete all as specified and directed. |
| 35 | M&L for pre-cast Reinforced Cement Concrete 1:2:4 type B-1 using 20mm graded stone aggregate as in cover slab of mane hole set in cement mortar 1:4 including demolition of existing broken cover slabs complete all as specified. |
| 36 | Demolition of cement concrete of any description andin any position complete all as specified and directed. |
| 37 | M&L for cement concrete 1:4:8 type D 2 (using 40 mm graded stone aggregates) as in foundations, filling ,bedding under pipe and mass concrete complete all as specified and directed. |
| 38 | Excavation in trenches n exc 1.5 m widen exc 1.5 m deep in soft/ loose soil for foundation etcor for shaft, wells, manholes etc n exc 10 Sqm on plan and not exc 1.5 m in depth and getting out complete all as specified and directed. |
| 39 | All as per item No. 37 above but exc 1.50 M depth not exc 3.00m depth all as specified and directed by Engr in charge |
| 40 | Removing excavated soil n exc 0.50m depositing where directed at alevel n exc 1.5 metre above the starting pointcomplete all as specified and directed. |
| 41 | Returning ,filling in including spreading ,levelling watering and well ramming withsoil in layers n exc 25 cm thick complete all as specified and directed. |
| 42 | Demolition and breaking up drain pipes (salt glazed ware)/ RCC/HDPE pipeof 150mm bore dia pipe set in cement mortar,including bedding,haunching pcc etc, complete all as specified and directed. |
| 43 | Demolition and breaking up drain pipes (salt glazed ware)/ RCC/HDPE pipeof 200mm bore dia pipe set in cement mortar,including bedding,haunching pcc etc, complete all as specified and directed. |
| 44 | Demolition and breaking up drain pipes (salt glazed ware)/ RCC/HDPE pipeof 300mm bore dia pipe set in cement mortar,including bedding,haunching pcc etc, complete all as specified and directed. |
| 45 | S&F HDPE double wall corrugated sewage pipe of 150 mm internal bore SN-8 as per IS 16098 Part-II 2013 laid in trenches, jointed and tested as per manufacturer instruction complete all asspecifed and directed. |
| 46 | S&F HDPE double wall corrugated sewage pipe of 200 mm internal bore SN-8 as per IS 16098 Part-II 2013 laid in trenches, jointed and tested as per manufacturer instruction complete all asspecifed and directed. |
| 47 | S&F HDPE double wall corrugated sewage pipe of 300 mm internal bore SN-8 as per IS 16098 Part-II 2013 laid in trenches, jointed and tested as per manufacturer instruction complete all asspecifed and directed. |
| 48 | S&F in repairs vitreous China urinal bowl, flat back of size 465mm x 355mm x 265mm (minimum) whitewith grating and union for discharge pipe , waste pipe(excluding flushing cistern,flush pipe ) complete all as per specified and directed. |
| 49 | S&F in repairsvitteous ChinawareEWC padestal type closet with whiteseat & cover with flat bottom with hinging device etc. complete all as per specified and directed. |
| 50 | S&F in repairsvitreous China squatting pan \"Orrisa pattern\" size 580mm x 440mmwhitewith integral foot rests any pattern including provn of cement concrete bedding and making connection with & including P or STrap, etccomplete all as specified and directed. |
| 51 | M&L for rendering 15mm thickcement plaster in cement mortar 1:4 onbrick work / Concrete surfaces finishing the surfaces even and smoothwith out using extra cement complete all as specified and directed. |
| 52 | M & L for applying three coats of white wash on new plastered wall/ceiling/chajja surface including preparation of surfacec omplete all as specified & directed. |