| 1 | Taking down carefully, disconnect the complete wiring and delete programming of existing Repeater Panel of make Notifier installed at NS-20 and reinstall the same at new location MT section with connection of wiring and reprogramme and addressing it as per requirement complete all as specified and directed. |
| 2 | Taking down existing smoke detector from NS-20 (from Bldg height 10 m) and re-fixing, reprogramming the same including provisioning of cable copnnection at new location (MT Section). complete all as specified and directed. |
| 3 | Taking down carefully, disconnect the complete wiring and delete programming of existing Mannual Call point of make Notifier installed at NS-20 and reinstall the same at new location MT section with connection of wiring and reprogramme and addressing it as per requirement complete all as specified and directed. |
| 4 | Taking down carefully, disconnect the complete wiring and delete programming of existing Monitor Module of make Notifier installed at NS-20 and reinstall the same at new location MT section with connection of wiring and reprogramme and addressing it as per requirement complete all as specified and directed. |
| 5 | Taking down carefully, disconnect the complete wiring and delete programming of existing Isolator Module of make Notifier installed at NS-20 and reinstall the same at new location MT section with connection of wiring and reprogramme and addressing it as per requirement complete all as specified and directed. |
| 6 | Taking down carefully, disconnect the complete wiring and delete programming of existing Control module of make Notifier installed at NS-20 and reinstall the same at new location MT section with connection of wiring and reprogramme and addressing it as per requirement complete all as specified and directed. |
| 7 | Taking down carefully. disconnect the complete wiring and delete programming of existing Zone Module of make Notifier installed at NS-20 and reinstall the same at new location MT section with connection of wiring and reprogramme and addressing it as per requirement complete all as specified and directed. |
| 8 | Taking down carefully, disconnect the complete wiring and delete programming of existing Siren of make Notifier installed at NS-20 and reinstall the same at new location MT section with connection of wiring and reprogramme and addressing it as per requirement complete all as specified and directed. |
| 9 | Taking down carefully and disconnect the complete exising wiring of any size from min height 10 m installed at NS-20 complete all as specified and directed. |
| 10 | SITC of ISI Marked 2 core x 1.5 mm2, Multistrand Copper, FRLS armoured cable, RED in Colour, laid on surface or under ground with GI saddle-spacers every 0.3 meters. Complete with conduit or in GI pipe GI Junction Box, lugs, cable compression glands, cable tags and Ferruling |
| 11 | Supply and fixing in trenches for suction pipe jointing 25 mm bore Gl tubing medium grade including all fittings such as bends elbows tees union short pieces connectors check nuts caps plugs etc for the following sizes complete all as specified and directed. Note: Excavation and earth work will be measured and paid seperately under relevent items. |
| 12 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth for exposing getting out GI/CI pipes in soft/loose soil all as specified and as directed. |
| 13 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 Im in depth for exposing getting out GI/CI pipes in hard/dense soil all as specified and as directed. |
| 14 | M&L for surface dressing in soft/loose soil not exceeding 15 cm deep and cleaning of area complete all as specified and directed. |
| 15 | Returning filling in, including spreading levelling watering and well ramming lin layers not exceeding 25 cm after the pipes have been laid all as specified and directed with soil |
| 16 | Removing excavated material / soil to a distance n. exc 50 m above starting point complete all as specified and directed. |
| 17 | M&L for PCC type B-2, 1:2:4 using 40 mm graded stone aggregate as in surface channels and drains etc complete all as specified and directed. |
| 18 | Reprogamming Testing and commissioning charges with deleting and adding existing programme in exiting main panels complete all as specified and directed. |