| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Dismantling of Cement Concrete Pavements Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 for Rural Roads of MORD. |
| 3 | Labour for taking out brick on end edging including removing debries to flank or berm sorting out servicible materials and stacking. |
| 4 | Labour for taking out brick-on-edge of herring bone bond including removing debris to flank or berm sorting out serviceable materials and stacking. |
| 5 | Labour for taking out old soling edging including removing debris(a) single brick flat soling. |
| 6 | Box cutting In road embankment in all kinds of soil and spreading the soil uniformely over the flanks and consolidating and dressing the subgrade to correct camber and grade. |
| 7 | Labour for laying brick edging (75 mm wide) with departmental brick laid true to line and level including carriage of departmental bricks within a lead of 30 metres cutting necessary trench in soil or in hard metalled surface laying the bricks and repacking the trench (on both sides of the edging) with spoils and ramming the same thoroughly(b) brick on end edging (250 mm. depth) |
| 8 | Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction.(b)brick on end edging (250 mm. depth) |
| 9 | Excavation for StructuresEarthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 10 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm including watering and ramming layer by layer complete with layer obtained from excavation of foundation or from fresh excavation of land arranged by the department within a lead of 150m. |
| 11 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.Note:1. Labour rate per m³ is provided; Cost of sand is to be added to arrive at the complete item rate 2. Compaction factor of dry clean sand is 0.835. |
| 12 | Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used).(d) Soling or dry pavement with one brick-on-edge laid in herring bone pattern on a layer of brick flat (thickness 75 mm. plus 125 mm) |
| 13 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(f) soling or dry pavement with one brick on edge laid in herring bone pattern over a layer of brick flat(thickness 125 mm plus 75 mm) |
| 14 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(a) Single brick flat Soling (thickness 75 mm) |
| 15 | Providing and laying nominal mix Cement concrete (with mix proportion 1:1½:3) / M-20 grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm of Pakur or other approved variety including Screening and cleaning of aggregates, if necessary, both of approved quality and cement, as necessary, compacting by vibrator or other suitabfe means, cost of curing with water, cost for quality control, sampling, testing etc. and including placing a Separation membrane of impermeable PVC sheet 125 micron thick transparent or white in colour laid flat with minimum creases. Before placing the separation membrane, the sub-base shall be swept clean of all the extraneous materials. Wherever overlap of plastic sheets is necessary, the same shall be at least 300 mm and any damaged sheathing shall be replaced at the Contractor\"s cost, including carriage of all materials to site but excluding the cost of staging, shuttering and and reinforcement if any. |
| 16 | Controlled Cement concrete with well graded stone chips (20mm nominal size) excluding shuttering and reinforcement with complete design of concrete asper IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes asper direction of Engineer incharge. Consumption of cement will not be less than 320Kg of cement with super plasticiser per cubicmeter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 30 Grade(i) Pakur Veriety |
| 17 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-chargeThe rate provided is exclusive of cost of steel materials. Construction wing should add cost & carriage of 1.05 MT (considering 5% wastage) of steel materials to arrive at the final consolidated item rate. |
| 18 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks / ply wood / steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and directionb) where staging is not requied On Concrete Road Portion |
| 19 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end.(ii)12.5 cm dia. |
| 20 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm.and less than 15cm (i) Jhaw / Eucalyptus. |
| 21 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tacklesNote:1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end.2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter.3) For driving done by pile engine set (without staging) under specific instruction of Engineer-in-charge, the rates will be enhanced by ` 4.00 per meter.4) For driving done by pile engine set (with heavy staging or from specially made pontoon) under specific instruction of Engineer-in-charge, the rates will be enhanced by ` 7.00 per metre.(ii) 12.5 cm av.diameter. |
| 22 | Coal tarring on wooden surfaces including cost of materials (a) One coat |
| 23 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (DIa. to be measured at mid length). |
| 24 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.A) where boats are not necessary |
| 25 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 26 | Supplying empty Cement bags in good condition |
| 27 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of filling materials, (Earth or sand) and gunny bags. |
| 28 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre Including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 29 | Extra rate over item nos 20 for all kinds of soil for every additional lead of 30 meters or part thereof beyond the initial lead of 30 meters |
| 30 | Earthwork in excavation In all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking A) Beyond 500 metre and upto 1.00 Km |
| 31 | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight. |
| 32 | Supplying,laying ,fitting &fixing R.C.C spun pipes and collers with cement morter (1:3) including fixing the pipes collers with jute,pitch etc. including the cost and carriage of spun pipes at site excluding the cost of collars.a) Spun pipes-600 dia, NP-2 Grade |
| 33 | Supplying RCC spun pipe collars including loading , carriage , unloading at site.a)Collar-600 dia, NP2 Grade |
| 34 | Direction and Place Identification Signs with size more than 0.9 sqm size Board. Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).. |
| 35 | Fine dressing and making the crest to correct camber and grade by cutting and filling earth where necessary including extra earth. |
| 36 | Design & Vetted of design by reputed institution along with all necessary soil tests. |
| 37 | Pumping from water from ponds or tanks(Payment if permitted will be made on the basis of initial water level on considerationbeing made for any water that may have been added through percolation or otherwise) |
| 38 | Add 18% for GST |
| 39 | Add 1% Cess Please Enable Macros to View BoQ information |