Scope of Work/Technical Specifications etc.1. To carry out periodic / scheduled inspection and maintenance of entire cabin and PCR AC system as per the check sheet and OEM recommendations in each equipment, once in a month.2. Attend and rectify minor breakdown/repair if any within 24 hrs. of complaint. To change / clean AC filters, compressor oil as and when required or as per maintenance manual.3. To do leakage test using nitrogen, refill the refrigerant gas if any leakages and rectifying the cause.4. To check sub parts of AC system such as compressor, evaporator, blower assy., thermostat, fuse, electrical connections, AC belt, etc. on regular basis and ensure their proper working so as to ensure comprehensive good cooling is provided by A.C.s reliably. To change/repair any sub part if it malfunctions.5. To ensure working of both cooling as well as heating systems throughout the contract period.6. All tools and tackles shall be provided by the AMC holder.7. Planning of spares for maintenance and repair to be procured and provided by project/NCL shall be required to be done by AMC holder.8. If a machine remains breakdown for a complete month, no payment shall be made for that machine in that particular month.9. During breakdown/maintenance of AC vehicle to be arranged by contractor itself and entry in mines to be allowed on temporary basis after verification of desired documents.
2
Annual Charges for Annual Maintenance Contract (AMC) for OE fitted Plant Air Conditioning System of PCR, Operator cabin and rest room.
3
Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.