| 1 | Scraping old white wash or color wash including disposal of refuse as direction by the engineer-in-charge with in a distance of 60 meter |
| 2 | Excavation in foundation in ordinary soil( Loam,clay or sand) including lift up to 1.5 M,and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches (Where machine con not reach/move) For building work only,(Excluding royalty) |
| 3 | Earthwork in cutting or in embankment by manual mean in ordinary soil, excavation to be in the from of regular pits not exceeding1/2 meter (20\") depth and earth work in embankment to be in 20cm (8\") layers including ramming and dressing the surface to required level and slopes and also including 1.5 M(5\") lifts and 30M (100ft) lead.distanceas directed by the engineer-in-charge |
| 4 | Cement Concrete with 4cm gauge approved Stone ballast coarse sand and cement in proporation of 12:6:1 inculuding supply of all materail labour and T&P etc.required for proper completion. |
| 5 | M-150 brick work in One part cement and Six part Fine sand in foundation and plinth including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 |
| 6 | M-150 brick work in One part cement and Six part Fine sand in superstructure including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 & 310. |
| 7 | 12mm thick plaster in 1:4 with one part cement and four part of approved coarse sand mortar including supply of all material, labour and T&P etc. required for proper completion of work. |
| 8 | Cement Concrete with 4cm gauge approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2 cm gauge stone grit instead of 4cm gauge stone ballast including supply of all materials labour and T&P etc for proper completion of work. |
| 9 | Mild steel of iron of samll size and section such as holding down bolts hold fast road,grathings etc of fabrication of hold fast nosing hold fast including bending for proper completion of the work |
| 10 | Supply & fixing 80 mm thick Precast cement concerete I-Shape interlocking paver block a with top layer of minimum 8 mm thickness having plan dimension 200x(160+120mm) of O.P. cement, smooth high gloss finish, skid reditant. Manufactured from rubber moulds through vibro compression machanism the compressive strenght of concrere paver block shall not be less than 30MPA (M-30) and wight 5KG per no confirming to IS 15658-2006 with a 4 cm thick layer of fine sand including cost of material, labour, T&P Taxes etc. requried for proper completion of the work as directed by Enginner-in-charge.(1) Gray color |
| 11 | Applying Oil Bond distempering/ snowcem with primer coatincluding supply of all material ,labour and T&P etc.required for proper completion of work |
| 12 | Applying two coat enaimel paint over one coat primer including supply of all material ,labour and T&P etc.required for proper completion of work |
| 13 | Supply & Fixing of RCC Bench for Setting including supply of all material,labour and T&P etc.required for proper completion of work |
| 14 | Supply & fixing innaurgation stone board including supply of all materials labour and T&P etc for proper completion of work. |
| 15 | Add Say amount Please Enable Macros to View BoQ information |