| 1 | DETAILS OF TRANSMISSION LINES WITH LENGTH UNDER ETC - BANDA Sl. No. Name of Transmission Line Length (in Ckt. Km) Total Length (A+B+C)(in Ckt. Km) Grand Total ETD-Banda + ETD-Hamirpur(in Ckt. Km) (ETD - Banda) O&M Desposit 988.3 1786.13 (A.) 132 KV Transmission lIne 1.0 132 KV Banda(220) - Banda 3.0 - 2.0 132 KV Banda(220) - Karvi 73.0 - 3.0 132 KV Banda(220) - Augasi 56.0 - 4.0 132 KV Banda(220) - Attara 45.0 - 5.0 132 KV Mau - Sirathu 64.3 - 6.0 132 KV Pahadi(220) - Mau 52.0 - 7.0 132 KV Pahadi(220) - Karvi 35.0 - 8.0 132 KV Pahadi(220) - Rajapur#1 (D/C) 22.0 - 9.0 132 KV Pahadi(220) - Rajapur#2 (D/C) 22.0 - 10.0 132 KV Banda(220) - Pailani 30.0 - 11.0 132 KV Pailani - Augasi#1 (D/C) 42.0 - 12.0 132 KV Pailani - Augasi#2 (D/C) 42.0 - Sub Total 486.3 0.0 Total (A) 486.3 (B.) 220 KV Transmission lIne 1.0 220 KV Banda(400) - Banda#1 (D/C) 27.0 2.0 220 KV Banda(400) - Banda#2 (D/C) 27.0 3.0 220 KV Banda(400) - Pahadi#1 (D/C) 113.5 4.0 220 KV Banda(400) - Pahadi#2 (D/C) 113.5 5.0 220 KV Banda - Fathepur 67.0 Sub Total 348.0 0.0 Total (B) 348.0 (C.) 400 KV Transmission lIne 1.0 400 KV Banda - Rewa#1 (D/C) 77.0 2.0 400 KV Banda - Rewa#2 (D/C) 77.0 Sub Total 154.0 0.0 Total (C) 154.0 (ETD - Hamirpur) 797.83 (A.) 132 KV Transmission lIne 1.0 Mahoba - Panwari#1 63.0 2.0 Mahoba - Panwari#2 51.0 3.0 Kabrai - Banda 40.0 4.0 Mahoba - Kabrai 28.0 5.0 Bharua sumerpur - Banda#1 56.0 6.0 Bharua sumerpur - Pailani 74.13 7.0 Hamirpur - Bharua sumerpur 52.0 8.0 Panwari - Rath 34.0 9.0 Panwari - Sarila 51.0 10.0 Rath - Sarila 44.0 11.0 Bharua sumerpur - Sarila 58.0 12.0 Panwari - Green Urja - 4.7 13.0 Hamirpur - Jehanabad 43.0 Sub Total 594.13 4.7 Total (A) 598.83 (B.) 220 KV Transmission lIne 1.0 Mahoba - Parichha (TPS) 146.0 2.0 Mahoba - Banda(400) 53.0 Sub Total 199.0 0.0 Total (B) 199.0 (C.) 400 KV Transmission lIne 1.0 NIL 0.0 Sub Total 0.0 Total (C) 0.0 Note : The Work against Lines under deposit shall be executed only if the O&M amount has been deposited by concerned Organisation. General Guide Lines for Estimation/BOQ Main Gang-A (With Main-Store) Description Monthly Rate Qty. Total Montly Cost Site Supervisor 28000.0 1.0 28000.0 28000.0 Fitter 20000.0 4.0 80000.0 80000.0 Vehicle 20000.0 1.0 20000.0 20000.0 Driver 15000.0 1.0 15000.0 15000.0 Diesel 30000.0 1.0 30000.0 30000.0 *T&P/Consumables 40000.0 1.0 40000.0 40000.0 Contingencies(as per total Ckt. Km. & Site Condition) @ 40 Per Ckt. Km. 25000.0 1.0 25000.0 20000.0 Main Store-A Office with added Spl. T&P 25000.0 1.0 25000.0 25000.0 Total (in Rs.) 263000.0 258000.0 Note : *For Site Office with main store Rs. 25000.00 per month extra against T&P shall be added. Main Gang-B (With Site-Store) Description Monthly Rate Qty. Total Montly Cost Site Supervisor 28000.0 1.0 28000.0 28000.0 Fitter 20000.0 4.0 80000.0 80000.0 Vehicle 20000.0 1.0 20000.0 20000.0 Driver 15000.0 1.0 15000.0 15000.0 Diesel 30000.0 1.0 30000.0 30000.0 T&P/Consumables 40000.0 1.0 40000.0 40000.0 Contingencies(as per total Ckt. Km. & Site Condition) @ 40 Per Ckt. Km. 25000.0 1.0 25000.0 20000.0 Total (in Rs.) 238000.0 233000.0 Sub Gang-C (without Store) Description Monthly Rate Qty. Total Montly Cost Site Supervisor 28000.0 0.0 0.0 0.0 Fitter 20000.0 3.0 60000.0 60000.0 Vehicle 20000.0 0.3 6000.0 6000.0 Driver 15000.0 0.3 4500.0 4500.0 Diesel 30000.0 0.3 9000.0 9000.0 T&P/Consumables 40000.0 0.25 10000.0 10000.0 Contingencies 25000.0 0.3 7500.0 6000.0 Total (in Rs.) 97000.0 95500.0 Guideline for each Divisions:- Rs. |
| 2 | For each Transmission Division:-For 200 Ckt.Km. To Max. 750 Ckt. Km., 01 No. Main Gang-A (with Main Store) shall be deputed & For Divisions looking after Transmission Lines below 100 Ckt.Km. the work may be clubbed in adjacent divisions. |
| 3 | If in a division the line length exceeds more than 750 Ckt. Km, then additional gang termed as Main Gang-B (with site store) will be added after 750 Ckt. Km. for every additional 1000 Ckt. Km. or the part their of. |
| 4 | Additional Sub-Gang-C (without store) shall be added alongwith the Main Gang-A/B for every additional 200 Ckt.Km. after first 500 Ckt. Km. or part their of. |
| 5 | The Estimated rates and BOQ may be updated as per above requirements. |
| 6 | Above Guide lines are for general reference purpose and additional gangs may be added as per Geographical/Senstivity based Circumstances within Division/Circle Tender Inviting Authority:- SUPERINTENDING ENGINEER , ETC ALIGARH,UPPTCL,LAL DIGGI ALIGARH-202001 PRICE SCHDULE & BILL OF QUANTITY AGAINST E-TENDER NO. ETC-87/2025-26/L For Comprehensive Preventive & Break Down Maintenance job of Transmission ( 400KV,220KV & 132KV ) Lines under ETC, Aligarh Sl. No. Description of Work / Item(s) Units Qty Estimated Unit Rate(in Rs.) Estimated Amount(in Rs.) To Be Quoted By Bidder in % Above (+) or Below (-) Estimated Rate Quoted unit Rate (in Rs.) Quoted Final Amount(in Rs.) |
| 7 | Comprehensive Preventive & Break Down Maintenance job of different 400/220/132KV Transmission lines under Electricity Transmission Circle, Aligarh ((G.Total 2691.95 Ckt. Km) )as per following :- |
| 8 | Comprehensive Regular Preventive & Break Down Maintenance job of different 400/220/132KV Transmission lines for smooth operation of transmission lines under Transmission Divisions as per Details and Technical Specifications described in Vol-II by Providing of Gangs/Establishment of Site Offices with Main Store/Site Store near designated Substation as detailed below comprising of skilled man power and T&Ps along with Establishment of Site Office for carring out various activities including Tower to tower patrolling and submission of patrolling report in prescribed format including photograph of defects, Emergency Patrolling, Lopping & chopping of tree branches/Bamboo Kothi coming in the corridor of the line, Thermography of Jumpers / Joints, Rectification of the line defects such as fixing of missing/stolen tower parts, Fixing of dislocated/New Vibration Dampers, Checking and tightness of jumpers, Cleaning of Disc Insulators etc. and attending of break down such as Replacement of damaged Jumpers, Replacement of damaged/broken Earth wire/OPGW, Replacement of damaged/ broken Quad/Twin moose/ Deer/ Zebra /Panther conductors, Repairing of coping with materials, backfilling of soil, Replacement of damaged/broken Tension/Suspension Insulators string, Repair of minor damages of Tower such as damage of Cross Arms/Tower Peaks including other associated works with all T&P and additional Man Power as needed. The T&P as per list in Vol-II shall be maintained by the Contractor at Main Site Office and other Site Offices. All the spare materials including special Testing Instruments will be provided by the UPPTCL except name/danger/phase plates which shall be under the scope of contractor. |
| 9 | Electricity Transmission Division-I, Aligarh (220 KV lines - 204.8 Ckt. Km., 132 KV lines- 419.86 Ckt. Km.) |
| 10 | Carrying out Comprehensive Maintenance work by a Main Gang-A comprising of minimum 01 No. Site Supervisior, 04 Nos.Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, special T&P and Material as per Technical Specifications including Establishment of Site Office at Boner (Aligarh) with Site Store having T&P as described in Appendix-B Vol-II (1 Job Per Month) |
| 11 | Carrying out Comprehensive Maintenance work by a Main Gang-B comprising of minimum 01 No. Supervisior, 04 Nos. Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, and Material as per Technical Specifications including Establishment of site office at Sarsol, Aligarh with Site Store having T&P as described in Appendix-B Vol-II (1 Job Per Month) |
| 12 | Carrying out Comprehensive Maintenance work by a Main Gang-B comprising of minimum 01 No. Supervisior, 04 Nos. Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, and Material as per Technical Specifications including Establishment of site office at Khair, Aligarh with Site Store having T&P as described in Appendix-B Vol-II (1 Job Per Month) |
| 13 | Electricity Transmission Division - II, Aligarh(220 KV lines - 613.3 Ckt. Km., 132 KV lines- 249.80 Ckt. Km.) |
| 14 | Carrying out Comprehensive Maintenance work by a Main Gang-A comprising of minimum 01 No. Site Supervisior, 04 Nos.Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, special T&P and Material as per Technical Specifications including Establishment of Site Office at Atrauli District Aligarh with Main Store having T&P as described in Appendix-B Vol-II(1 Job Per Month) |
| 15 | Carrying out Comprehensive Maintenance work by a Main Gang-B comprising of minimum 01 No. Supervisior, 04 Nos. Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, and Material as per Technical Specifications including Establishment of site office at Sikandrarao Distric Hathras with Site Store having T&P as described in Appendix-B Vol-II (1 Job Per Month) |
| 16 | Carrying out Comprehensive Maintenance work by a Sub Gang-C comprising of minimum of 03 Nos.Skilled Technician (Fitter) at Kuravali District Mainpuri as per technical specifications (1 Job Per Month) |
| 17 | Carrying out Comprehensive Maintenance work by a Sub Gang-C comprising of minimum of 03 Nos.Skilled Technician (Fitter) at Atrauli,Aligarh as per technical specifications (1 Job Per Month) |
| 18 | Electricity 400kV Substation Division, Aligarh(400 KV Lines - 335 Ckt. Km., 220 KV lines - 40 Ckt. Km., 132 KV lines- 59.29 Ckt. Km.) |
| 19 | Carrying out Comprehensive Maintenance work by a Main Gang-A comprising of minimum 01 No. Site Supervisior, 04 Nos.Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, special T&P and Material as per Technical Specifications including Establishment of Site Office at Akrabad District Aligarh with Main Store having T&P as described in Appendix-B Vol-II(1 Job Per Month) |
| 20 | Carrying out Comprehensive Maintenance work by a Sub Gang-C comprising of minimum of 03 Nos.Skilled Technician (Fitter) at Akrabad/Gangiri,Aligarh as per technical specifications (1 Job Per Month) |
| 21 | Electricity Transmission Division , Mainpuri(220 KV lines - 195.36 Ckt. Km., 132 KV lines- 573.59 Ckt. Km.) |
| 22 | Carrying out Comprehensive Maintenance work by a Main Gang-A comprising of minimum 01 No. Site Supervisior, 04 Nos.Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, special T&P and Material as per Technical Specifications including Establishment of Site Office at Mainpuri with Main Store having T&P as described in Appendix-B Vol-II(1 Job Per Month) |
| 23 | Carrying out Comprehensive Maintenance work by a Main Gang-A comprising of minimum 01 No. Site Supervisior, 04 Nos.Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, special T&P and Material as per Technical Specifications including Establishment of Site Office at Etah with Main Store having T&P as described in Appendix-B Vol-II(1 Job Per Month) |
| 24 | Carrying out Comprehensive Maintenance work by a Main Gang-B comprising of minimum 01 No. Supervisior,04 Nos. Skilled Technician (Fitter) equipped with 01 No. Pickup or equivalent vehicle along with Driver suitable to shift men, T&P, and Material as per Technical Specifications including Establishment of site office with Site Store having T&P at Kasganj as described in Appendix-B Vol-II (1 Job Per Month) Total (in Rs.) 59832000.0 0.0 59832000.0 Note- 1.GST shall be paid EXTRA as per rules 2. Thermovision Camera as per technical specification shall be arraged by the Contractor at his own end. 3.The details of various transmission lines & their ckt.km.are mentioned in Annexure-1&2 of Vol-II(Section 6) of the tender document. 4.Bidders have to submit their % Rates above or below the Estimated Rates (Excluding \"%\" symbol in \"Blue Box\" only). 5.Bidders will submit their Rates by putting \"X\" for \"X\"% of Higher than Estimated Rates (ie.will put simly 1.0 for quoting 1.0% higher than Estimated Rates) 6.Bidders will submit their Rates by putting \"-X\" for \"-X\"% of Lower than Estimated Rates (ie.will put simly 1.0 for quoting 1.0% higher than Estimated Rates) Signature of the Bidder: - Name of the Bidder : - Seal of the Firm:- |