| 1 | Providing, laying spreading and compacting graded stone aggregate (size range 53mm to 0.075mm) to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carraige of mixed material by tipper to site, for all leads and shifts, laying in uniform layers with mechanical paver finisher in sub-base/ base course on prepared surface and compacting vibratory roaller of 8-10 tonne capacity to achieve the desire density, complete as per specifications |
| 2 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity |
| 3 | Providing and laying 25mm thick semidense Bituminous concrete using crushed stone aggregate of specified grading, premixed with bitumnious binder and filler, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and per direction of Engineer-in-charge. 25mm Compacted thickness with bitumen of grade VG-30 @5% (percentage by weight of total mix) and lime filler @2% (percentage by weight of Aggregate) prepared in Batch type Hot Mix Plant of 60-90 TPH. |
| 4 | Providing and laying tack coat using Hot straight run bitumen of grade VG-30 including heating the Bitumen,spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications. On bitumen surface @0.75Kg/Sqm (including cost and carraige of all materials involved upto site of work and all taxes involved account of labour and material involved bitumin Octroi charges quantity control etc.) |
| 5 | Providing and laying tack coat using Hot straight run bitumen of grade VG-30 including heating the Bitumen,spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications. On bitumen surface @0.5Kg/Sqm (including cost and carraige of all materials involved upto site of work and all taxes involved account of labour and material involved bitumin Octroi charges quantity control etc.) |
| 6 | Engaging jcb for cleaning of Drain, Berm dressing etc. |
| 7 | Removal of debris including shifting of mulba from site to dumping yard by engaging Tractor with Trolley. |
| 8 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil |
| 9 | P/L in position Cement conc. 1 cement:4fine sand:8graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. |
| 10 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. |
| 11 | Centring and shuttering including strutting, propping etc and removal of form work for.- foundation, footing, base of columns |
| 12 | Centring and shuttering including strutting, propping etc and removal of form work for.- Suspended floor/slab |
| 13 | Centring and shuttering including strutting, propping etc and removal of form work for.- Edges of slab ( under 20cm wide ) |
| 14 | Providingand and laying in position specified grade of reinforced cement concrete (1:1.5:3) excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level. |
| 15 | Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete |
| 16 | Providing and laying in position 50mm thick cement concrete Flooring in 1 cement:2 fine sand:4 graded crushed stone aggregates 20mm size |
| 17 | steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 18 | Carriage of sand with in avg. lead 10 km by M.T. |
| 19 | Carriage of Aggregate with in avg. lead 10 km by M.T. Please Enable Macros to View BoQ information |