| 1 | Construction of granular sub base by proiding wel graded material,spreding in uniform layours on prepared surface,mixing by mix in place method and compacting disered density,as per Specification clause 401. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST. |
| 2 | providing ,laying spreading and compacting stone aggrigates of specific sizes of water bound mecadem specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 kn static roller in stages to proper grade and camber, applying and brooming , crushable screening to fillup intersticks of coarse aggrigates, watering and compacting to the required density grading 3 as per technical specification clause 405. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST. |
| 3 | M-150 class Brick work in 1:4 Cement & Coarse sand mortor in fdn. & up to plinth including supply of all materials, labour, T & P etc S.I No.305(a). Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST. |
| 4 | laying of 80 mm thick I shaped compressed interlocking cement concrete paver block tiles. including leveling and dressing of surface up to required level and slopes filling joints with local sand i/c all. S I No 26(i) + 20.11 New item. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST. |
| 5 | C.C work in 1:2:4 cement coarse sand and 20 mm stone grit including supply of all materials, labour, T & P etc. SINo 279(a). Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST. |
| 6 | 12 mm thick plaster in 1:4 Cement and Coarse sand mortar including supply of all materials, labour, T & P etc. SINo 584 (a). Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST. |
| 7 | Providing concrete for reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, R.C.C grade M 20. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST. |
| 8 | Supplying, fitting and placing TMT bar reinforcement (Fe 550) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST. Please Enable Macros to View BoQ information |