| 1 | M & L for Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out In Hard/dense soil.completed all as specified |
| 2 | Exavating intrenchesn. exe 1.5 m wide and n. exe 1.5 m in depth, for foundation etc or for shafts, wells, cess pits, man holes, pier holes etc n exe 10 sq m on planand getting out in Hard / dense soil complete all as specified and directed. |
| 3 | Demolition of cement concrete unreinforcedin ground floors and pavings n exc 15 cm thickness (below or above ground level). Complete all as specified and directed. |
| 4 | M & L for cement concrete 100 mm thick 1 : 2 :4 type,B-2 (using 20mm graded stone aggregate) as insub base/path, floor etc and finishing even and rough/ smooth without using extra cement complete all as specified and directed. |
| 5 | M&L for crushed sand filling under floors or in foundations including watered and consolidation complete all as specfied and directed |
| 6 | M&Lfor Machine pressed precast concrete inter locking paver blocks of any shape andsize conforming to IS 15658- 2006of 60 mm thick M-35 grade with grey cement andpigment with glosey finish andincluding removing the existing paver blocksincluding removing of debries out side MD land complete all as specified and directed. |
| 7 | M&L for Chequered cement concrete tile 20CM x 20CM x 25mm thick with grey cement and pigment set, jointed and pointed in neat cement slurry in floors over and including cement mortar bedding 20mm thick in CM 1 : 6, 1 complete all as specified and directed.. |
| 8 | Demolition of brick work built in cement mortar including all quoins, cornices , concrete coping etc on brickwork complete all as specified and directed. |
| 9 | M&L for Brick work with sub class-\"B\" Bricks, straight or curved on plan exc 6m mean radius built in CM (1:6) Complete all as specified and directed. |
| 10 | M&L for pre-cast cement concrete1:3:6, type C1 using 20mm graded stone aggregate as in solid block masonry exc.100mm width and built in CM(1:4) all as specified and directed. |
| 11 | Demolition ofcement concrete reinforced of any description and in any position not otherwise specifically provided for complete all as specified and directed. |
| 12 | M&L RCC1 : 2 : 4 type B-1 (using 20mm graded aggregate) for cover slab MHincluding necessary form workand set in cment mortar 1 : 4,complete all as specified and directed. |
| 13 | Supply and fix TMT bar 10mm dia and over, cut to length, bent to shape required including cranking bending, spirally or hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips complete all as specified and directed confirmed to Fe 410-0 complete all as specified and directed. |
| 14 | Taking down cement or cement lime plaster any description on brick or stone wall etc including racking out joints hacking for keyscrbbing down with water completed all as specified and directed. |
| 15 | Rendering 15mm thick in (1:4) cm in two layers (first layer 10mm thick and top layer 5mm thick) with both layers surface finished even and fair without using extra cement.complete all as specified and directed. |
| 16 | M&L for two coats of cement base paint over one coat of cementprimer on new surface of wall including preparation of surface complete all as specified and directed. |
| 17 | Demolition ofcement concreteof any description and in any position not otherwise specifically provided for complete all as specified and directed. |
| 18 | M&L for PCC 1:4:8 type D2 using 40mm graded crushed stone aggregates as in foundation filling and mass concrete in foundation of fencing posts complete all as specified and directed. |
| 19 | Returning, filling in, including spreading, levelling, watering and well raming in layer not exe 25cm complete as specified and directed. |
| 20 | Removing exavated material outside MoD land exe 1.50km but n. exe 5km and depositing where directed complete as specified and directed. |
| 21 | Deduct Credit for Demolished/ Dismantled material Rs. (-) 16,800.00 (Minus) as listed in Schedule of Credit.Note 1:- Tenderers will not quote against this item being a tentative amount to be considered to arrive at the \"Contract Sum\".Note 2:- The tenderer must keep in mind when quoting rates against items out in multi-storey bldgs having height 4 mts and above. Necessary scaffolding and saftey measures required during execution of work are including in this items. |