| 1 | Strengthening of Arasalapuram road, Km 0/0 - 0/780 |
| 2 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. |
| 3 | km 0/0 - 0/780 |
| 4 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br |
| 5 | km 0/0 - 0/780 |
| 6 | Picking the Existing damaged BT Surface |
| 7 | km 0/0 - 0/780 |
| 8 | Collection and supply of US gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete, |
| 9 | km 0/0 - 0/780 |
| 10 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 11 | km 0/0 - 0/780 |
| 12 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 13 | km 0/0 - 0/780 |
| 14 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by b |
| 15 | km 0/0 - 0/780 |
| 16 | BITUMINOUS CONCRETE 40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggr |
| 17 | km 0/0 - 0/780 |
| 18 | Provision of 15 nos of rumble strips covered with premix bituminous carpet, 15 - 20 mm high at centre, 250 mm wide placed at 1 m center-to-centre at approved locations to control speed, marked with white strips of road marking paint. |
| 19 | km 0/0 - 0/780 |
| 20 | Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site |
| 21 | km 0/0 - 0/780 |
| 22 | Provision for HM Stones of size 75 x 23 x 10 cm. |
| 23 | Provision for 60Cm Equilateral Triangular Sign board Charges |
| 24 | Provision for Citizen cum Name board Charges |
| 25 | Provision for Photographic Charges |
| 26 | Construction of 1.50m span RCC slab Culvert @ CH 71 m |
| 27 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 28 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 29 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 30 | Below Sill |
| 31 | Above Sill |
| 32 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 33 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 34 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works. |
| 35 | Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 36 | Provision for Bitumen Pads |
| 37 | Provision for Wheep Holes |
| 38 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |