| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavatedearth leadupto 500 m and lift upto 1.5 m, as directed by Engineer-in charge.( All kinds of soil) |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 500 m and lift upto 1.5 m.( All kinds of soil) |
| 4 | Soling (or sub base) with broken boulders or quarried stone, inter stices filled, surface formed and rolled and consolidated to required gradient and camber (Minimum 100 mm thick of Broken Bolder/Stone layer ) |
| 5 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 20mm nominal size derived from natural sources |
| 7 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 20 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item ofdowel bars with sleeve/ tie bars to be paid separately). (Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/less cement used as per design mix is payable/ recoverable)Cement concrete prepared with batch mixing machineCement concrete manufactured in automatic batchingplant (RMC plant) i/c transportation to site in transitmixer |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 9 | 12 mm cement plaster of mix :(1 cement: 6 fine sand) |
| 10 | Providing and fixing on wall face unplasticised Rigid PVCpipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382 including All Fitiings required 110 mm dia Pipe |
| 11 | Finishing walls/ plastered wall with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 12 | Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (Above 10.00 Meter and upto 12.00 Meter) including LED Streetlight fixture, powdercoatedpressurediecastaluminiumbody(Systemlumen efficacy >135 lm/Watt) , Supplying,Installation,Testing&CommissioningofStreetlightLEDfixture, powdercoated pressure die cast aluminium body with built in or separate driver as per the requirement with Driver 98 watt |
| 13 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench, termination including lugs, etc as required. (4 x 10 Sq.mm copper Cable) |
| 14 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench termination including lugs etc as required. (4 x 50 Sq.mm Armoled Aluminium Cable) for Main Supply of Feeder panel |
| 15 | Supplying and fixing horizontal type feeder panel single door three pole and neutral, sheet steel, MCB distribution board 415volts, on surface/ mounted, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar , interconnections, powder painted including earthing etc as required. ( with including On/Off switch & indication , 63 A RCCB, timer, MCB, contactor, connections,etc) |
| 16 | Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board , 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) |
| 17 | Supplying and fixing following rating, double pole, 240 V, isolator in the existing MCB DB complete with connections, testing and commissioning etc. as required. 63 A |
| 18 | Providing and fixing Traffic regulatory signage with Single pole.(Speed limit, No parking/ Pedestrian crossing, parking area / zone) Signage with Single pole is to be made of 304 Grade SS 75x75x3mm. B) Panel:- Panel framing is to be made of 50x50x4mm SS 304 grade SHS and Aludecore make Exterior grade5mm ACP Sheet (having 0.5 mm Aluminium Foil side covering)is to be used for avoid Joints. Text & Graphics will be in 3M/ Avery HIP grade prismatic Retro-reflective with Overlay film duly digitally plotter cut and pasted on base on Single side as per design. 1.(Complete With RCC work ofFoundation of 450x450x900 with 10 mm base plate and 12 mm Nut bolt with washer 600mm long) 2.(Defect Liability Period (DLP)-01 Year from the date of completion of work). Pole with Single Panel height is to be 3300 mm above GL (Panel Size 900x1200) |
| 19 | Providing and applying 2.5 mm thick road marking strips (retro reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications |
| 20 | Credit Item:-Dismantaling steel Structure / Work manually/by mechnical means in builtup sections & wire mesh fencing including base of RCC/CC foundation foundation & credit to chain link fabric fencing item(it also includes removal of any debris/concrete demolitionand clearance of site by removing waste material to lead upto 1 km) |