| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 3 | Providing and laying of stone soiling dully hand packed including carriage of stone soling with loading unloading and stacking complete. |
| 4 | Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:4:8 (1cement: 4fine sand: 8 graded stone aggregate 40mm nominal size)(Crushed). |
| 5 | Random Rubble masonry with hard stone (Quarry) in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth:With bond stone. |
| 7 | Random Rubble masonry with hard stone (Quarry) in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, (Labour Only). |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 10 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers. |
| 12 | Supply and filling of boulders behind the retaining wall dully hand packed including carriage of boulders with loading unloading and stacking complete |
| 13 | carriage of material by mechanical Transport from source to site of work MT |
| 14 | Sand for an average of 20 kms |
| 15 | Stone Aggregates for an average lead of 20 kms. |
| 16 | Stones. Please Enable Macros to View BoQ information |