|
| 1 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying upto 2 drum incl loading & unloading using crane |
| 2 | Stringing of 1.1 kV Aerial bunchedcable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messengerthrough existing poles |
| 3 | Loading LT PSC pole from the stackingplace and unloading the same at worksite (transport by vehicle). |
| 4 | Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4poles excluding loading & unloading. |
| 5 | Loading HT PSC pole from the stackingplace and unloading the same at worksite (transport by vehicle) |
| 6 | Insertion of one HT PSC pole in existingline incl. digging & backfilling pit,fitting cross arm, insulators, binding etc |
| 7 | Erecting one LT PSC Pole in positionincl. digging & back filling pit. |
| 8 | Fitting and providing one HT Stay for11kV pole incl. digging & back fillingpit |
| 9 | Providing Stay for LT poles incl.digging & back filling pit. |
| 10 | Providing one Coil Earth using GI earthwire, digging separate pit at standarddistance away from the pole/structure &backfilling. |
| 11 | Fitting one No. Section fuse on LT linewith dropping cables, crimping sockets,connecting with bolt&nut etc |
| 12 | Erection of Anchor clamp / dead endclamp for LT ABC of any size |
| 13 | Providing Cable Tie |
| 14 | Providing End Caps |
| 15 | Installation of Insulation piercingconnector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 16 | Installing One No. Insulation piercingconnector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 17 | Installing One No. 4 way SatelliteConnector of size Main :16 to 95, Tap:4to 35 Sq.mm to the LT AB cable ofStandard size |
| 18 | Erection of suspension clamp for LTABC of any size |
| 19 | Dismantling (without damage) one kmLT 3ph 4 wire OH line, cross arms,insulators and stacking the conductors inrolls |
| 20 | Dismantling (without damage) one kmLT additional conductor line, cross arms,insulators and stacking the conductors inrolls |
| 21 | Installation of Pre-insulated straightthrough joints for 16sqmm cable |
| 22 | Installation of Pre-insulated straightthrough joints for 70sqmm cable |
| 23 | Installation of Pre-insulated straightthrough joints for 50sqmm cable |
| 24 | Renewal of existing damaged/broken oldLT stay with existing stay rod. |
| 25 | Additional rate for excavation of one Pitfor LT Pole/LT Stay in Laterite |
| 26 | Straightening one Slanted LT pole afterunbinding the line and rebinding the lineafter work |
| 27 | Reconductoring one km LT Sph 2 wireOH old line with new ACSR Rabbitconductor incl. conveyance of materials |
| 28 | Dismantling and reconnecting Sphservice connection from the OH lineincl. lowering down the WP portion |
| 29 | Insertion of one LT PSC pole in existingSph OH line incl. digging & back fillingpit, fitting cross arm, insulator, bindingetc. |
| 30 | Renewal of existing damaged/old LTstay with new stay in place and refittingof all items and conveyance of allmaterials. |
| 31 | Renewal of existing damaged/old LTPSC/RCC (Sph line) pole with new PSCpole in place and refitting of all items incl. conveyance (except pole) |
| 32 | Dismantling one LT 2 line cross armfrom existing pole. |
| 33 | Fitting one LT 2 line cross arm on HT orLT existing poles incl. fitting insulatorsand binding the same with LT Line |
| 34 | Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays,strut etc. and stacking the same. |
| 35 | Renewal of existing damaged/old LTPSC/RCC (3ph line) pole with new PSCpole in place and refitting of all itemsincl. conveyance (except pole). |
| 36 | Dismantling (without damage) one kmLT Sph 2 wire OH line, cross arms,insulators and stacking the conductors inrolls. |
| 37 | Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erectedpole and reconnecting |
| 38 | Fitting of one No. pole top serviceconnection box of standard size (up to 4way) using ss strap/B&N of suitable sizein to the PSC/A poles at the standardheight excluding giving connections |
| 39 | Providing one Earth using earth pipeincl. digging separate pit at standarddistance away from the pole/structure &backfilling Please Enable Macros to View BoQ information |