|
| 1 | Construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface comp |
| 2 | Dismantling of interlocking Tiles including labour ,T&P in all complete. |
| 3 | White Topping:- Construction of thin white topping with plain cement concrete (PCC-M40) pavment over existing surface with approve grade cement at 430 kg per cum and per IRC:SP-76 course and fine aggretes confirming to IS 383, maximum size of aggregate not exceeding 25mm, maximum water cement ratio 0.40mised in a batching and mixing plant as per approved design, transported to site , laid with a fixed slipfrom paver, spead,compacted and finished in a continous operation including provision of contraction joint joint filler etc all complete. |
| 4 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet). Ch-17 (697) |
| 5 | Dismantaling brick work or stone work in lime or cement mortar and including stocking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) etc all complete Ch-17 (692) |
| 6 | Earth work in excavation in trenches for foundation pipe cable etc ordinary soil (loan clay or sand )including lift up to 50mm and dressing of sides and ramming of bottum and disposal of surplus excavated earth . |
| 7 | Earth work in cuttine in ordinary soil lead 30 mt. & lift 1.5 mtincl lab T&P etc all comp |
| 8 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P,etc all complete. ) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors.Ch-5 (273) |
| 9 | R.C.C works with cement approved coarse sand and 2 cm (3/4”) gauge approved stone ballast in the proportion 1:1.5:3 (1 cement:3 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centring and shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work. stone ballast but for slab including shuttering mat. Lab etc. All complete Ch-5 (284) |
| 10 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate)12 mm to 32 mm. tor etc.all complete. Ch-10 (504 c) |
| 11 | Supply and fixing inogration board with paidestal and granite board etc all comp |
| 12 | providing and laying in cement concrete4;2;1 of not less than strength of M 150 (stone ballast 4 20 mm nominalsize ; 2 approved coarse sand ;1 cement ) and curing complete including cost of form work in open foundation and floors |
| 13 | Class -150 brick work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials,labour and tools and plants etc. required for proper completion of the work. Etc all complete.Ch-6 (305) |
| 14 | 12mm. Thick plaster in single coat on fair side of single or half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and/or rounded angles not exceeding 80 mm. in girth and finished evenand smooth No extra for mixing any additive and 1:3 cement:coarse sand etc all complete. Ch-13 (17.58 (1)) |
| 15 | Providing & Laying of Rubber moulded interlocking Concrete Block with 80mm thick ICBP(75% Gray & 25% Red/Yellow coloured) having strength not less than 30KN/m2 complete as per Technical Specification Clause 1500. |
| 16 | Downing of shokhta etc all comp |
| 17 | Sale of material to contractor old brick etc all comp |
| 18 | Sale of material to contractor brick bats etc all comp |
| 19 | Disposal of earth up to 3 km loading and unloading etc all comp |
| 20 | Add 18% GST Please Enable Macros to View BoQ information |