| 1 | Boundary Wall WorksEarth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.D.S.R. 2023 Item No. 2.8.1 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)D.S.R. 2023 Item No. 4.1.8 |
| 3 | Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)D.S.R. Item No. 5.1.3 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)RCC Work for Raft Footing, D.S.R. 2023 Item No. 5.1.2 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for thefollowing grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cumD.S.R. Item No. 5.33.2.1 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. Rate As per MDA 2025 Analysis. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concreteDSR 2023 Item No. 5.9.1 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and StrutsDSR 2023 Item No. 5.9.6 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form forLintels, beams, plinth beams, girders, bressumers and cantileversDSR 2023 Item No. 5.9.5 |
| 10 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)D.S.R. 2023 Item No. 6.2.1 |
| 11 | Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:4 (1 cement : 4 coarse sand) : With F.P.S.(non modular) bricksD.S.R. 2023 Item No. 6.3.1 |
| 12 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar worksD.S.R. 2023 Item No. 10.25.2 |
| 13 | 12mm thick plaster with 1:4 ( one part cement & four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, T&P etc. required for proper completion of the work.D.S.R. 2023 Item No. 13.4.1 |
| 14 | Finishing with EPOXY paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface with putty etc. complete on concrete work D.S.R. 2023 Item No. 13.52.2 |
| 15 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufactureD.S.R. 2023 Item No. 13.62.1 Please Enable Macros to View BoQ information |