| 1 | Earth work in excavation of foundation in Mar, Rankar and Kabar mixed soils in digging or in embankment including lead up to 30m. and lift up to 1.5m. including dressing making profile and manual compaction but excluding mechanical compaction proper completion of work as per direction of Engineer-in-charge. |
| 2 | Earth work in excavation in Mar, Rankar and Kabar mixed soils in digging for Chanalization of Escape channel including initial lead up to 30m. and lift up to 1.5m. including dressing making profile and manual compaction but excluding mechanical compaction proper completion of work as per direction of Engineer-in-charge. |
| 3 | Earth work in filling in Mar, Kabar, Ranker and Kanker mixed soil with all lead & lift including levelling, dressing and making profile all complete of work proper completion of work as per direction of Engineer-in-charge. |
| 4 | Removing Diversion including lead upto 595m. and lift upto 1.5m. including dressing making profile and manual compaction as per direction of Engineer-in-charge. |
| 5 | Providing and laying sand including cost of all material, labour and T&P required for proper completion of work as per direction of Engineer-in-charge.. |
| 6 | Providing and laying M-10 cement concrete 1:3:6 in including cost of all material, labour and T&P required for proper completion of work as per direction of Engineer-in-charge. |
| 7 | Providing and laying M-15 cement concrete 1:2:4 in including cost of all material, labour and T&P required for proper completion of work as per direction of Engineer-in-charge. |
| 8 | Laying R.C.C. M-25 1:1:2 cement concrete with 13.2mm & 19mm size stone grit including cost of all materials and labour, T&P required for proper completion of work as per direction of Engineer-in-charge. |
| 9 | Laying R.C.C. M-20 cement concrete with 13.2mm & 19mm size stone grit including cost of all materials and labour, T&P required for proper completion of work as per direction of Engineer-in-charge. |
| 10 | Providing & laying steel reinforcement including cost of steel, cutting, bending, placing in position, binding with G.I. wire & welding etc. including cost of all material, labour, T&P etc. complete of work as per direction of Engineer-in-charge. |
| 11 | Centering & Shuttering including material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 12 | Dismenttling lime or plain cement concrete including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 13 | Dry Stone Boulder Pitching including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 14 | Weep hole 75mm dia. including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 15 | Supply & fixing of Geo textile (sheet) made of 200 gsm woven multifilament polyprophlene yarn all complete of work as per direction of Engineer-in-charge. |
| 16 | Bearing (Elastomeric bearing assembly consisting of 7 internal layers of elastomer bonded to 6 nos. internal reinforcing steel laminates by the process of vulcanisation) |
| 17 | R.C.R. stone Khanda masonary in 1:4 CM including cost of all materials and labour, T&P required for proper completion of work as per direction of Engineer-in-charge. |
| 18 | Brick work in 1:4 CM including material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 19 | Providing and Laying cement plaster in 1:4 CM including material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 20 | Painting Synthetic Enamel paint of approved quality including all cost of material, labour and T&P complete as per direction of Engineer-in-charge. |
| 21 | Painting two coat on wall including cost of all material, labour and T&P required for proper finish of work as per direction of Engineer-in-charge. |
| 22 | Supplying & Fixing of M.S. Door & Window including all cost of material, labour, T&P etc. complete of work as per direction of Engineer-in-charge. |
| 23 | By Mix in place Method (For Drainage Layer)Construction of granular sub-base grade IIIrd by providing well graded material, for blanket coat 15 cm compacted thick spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 24 | Granular Sub-Base with well graded material (400.1)Construction of granular Sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with Smooth wheel roller to Achieve the desired density. complete as per technical specification caluse 401. |
| 25 | Water Bound Macadam Sub-base/baseWBM Grading-IIProviding, laying, spreading and compacting of 45-63 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. |
| 26 | Water Bound Macadam Sub-base/baseWBM Grading-III Providing, laying, spreading and compacting of 22.4-53 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. |
| 27 | Prime Coat Low PorosityProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleading of road surface and spraying primer at the rate of 0.70 to 1.00 Kg/sqm using mannual means. clause 502 |
| 28 | Providing and applying tack coat with V.G.-10 bitumen using bitumen pressure dristributor @ 0.35 to 0.45 kg. per sqm. on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 29 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) BinderProviding laying and rolling of open greded premix carpet of 20 mm thick compacted composed of 13.2mm and 11.2mm aggregate using bitumen VG-10 @ 1.46 Kg. per sqm to required line, grade & level to serve as wearing coat on a previously prepared base, including mixing in a suitable mixall plant, laying and rolling with a three wheel 80/100 kN static roller capacity finished to required level and grade including all material, labour, T&P hire & fuel charges of mixall and roller etc. (As per MORD Databook clause 5.90 (508) |
| 30 | Seal CoatProviding laying seal coat type C with 6.7 mm stone chippings @ 0.009 cum per sqm precoated with Bitumen VG-10 @ 0.65 Kg. /sqm in a suitable mixall plant and rolling with a three wheel 80/100 kN static roller to seal the voids in a bituminous surface laid to the specified levels, grade and cross fall as per technical specification Clause and also including all material, labour, T&P hire & fuel charges of mixall and roller etc. (as per MORD data book clause 5.12 (510) |
| 31 | Laying & Lowering R.C.C. Hume pipe for Making Diversion\ including all carriage, loading, unloading, and fixing coller & making joint complete of work. |
| 32 | Laying & Lowering Removing 1200mm R.C.C. Hume pipe after Construction work including all carriage, loading, unloading, and fixing coller & making joint complete of work. |
| 33 | Laying & Lowering 600mm dia. R.C.C. Hume pipe in Inlet including all carriage, loading, unloading, and fixing coller & making joint complete of work. Please Enable Macros to View BoQ information |