| 1 | Ordinary jungle clearance (Only where the growth is continuous). |
| 2 | E/W in filling and embankments including lead up to 30 m & lift up to 1.50 m excluding mechanical compaction but including manual compaction and dressing to profiles |
| 3 | S/Laying filter behind abutment 20 to 40 mm cum M-150 class brick ballast |
| 4 | 1st Class Brick work in 1:4 C.M. with coarse including cost of all material, Labour and T&P |
| 5 | Centering and Shuttering for RCC work including cost of all material, Labor and T&P |
| 6 | Bending,Binding, Cutting and Placing of reinforcement including cost of all material, Labour and T&P |
| 7 | P/L Cement conctreate 1:1.5:3 M 20 with 4.75 to 20 mm aggregate well mixed and laid in position complete i/c all leads of all construction materials i/c curing and finishing having well graded crusher broken stone aggregate |
| 8 | P/L Cement conctreate 1:1:2 M 25 with 4.75 to cum 10 mm aggregate well mixed and laid in position complete i/c all leads of all construction materials i/c curing and finishing having well graded crusher broken stone aggregate |
| 9 | Providing and fixing 75 mm dia PVC pipe in weep hole per R.M. |
| 10 | Providing and laying 25 mm joint filler board (bituminous) per sqm |
| 11 | Providing and laying tarfelt in two layer with coating in each layer with bitumen (85/25) grade between abutment and slab per sqm |
| 12 | Cement pointing on 1:2 Cement and fine sand mortor including supply of material, labour and T&P. etc. all complete the work. As per direction of Engineer-in-charge. |
| 13 | Supplying and fixing of 75x75x6 angle iron including all cost of material, labour and T&P. |
| 14 | Finishing wall with water proofing cement paint of approved make such as super snowcem, Durocem robiecem, Guttu cem, Super cem quality and of required shade on new wall surface (two coats) over one coat of white cement primer to give and even shade after throughly brushing the surface to remove powdered materials including curing and cost of all materials |
| 15 | Painting chainage in V.R.B. |
| 16 | Dry Brick on edge solling for making Ramp including preparing sub-grade,filling joints with local earth spreading, a binding coat of 1 cm of local earth on entire surface made and all labour , T&P to complete the job per sq. metre. Please Enable Macros to View BoQ information |