| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 15.2.1 1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :50%.2 Ordinary Rock30%3 Hard Rock20% |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiralstair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth levelMild steel and medium tensile steel bars |
| 10 | Dumping/filling stone including cost of stones. in Horizontal on level |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for:Edges of slabs and breaks in floors and walls Above 20 cm wide |
| 15 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete 900 mm dia. R.C.C. pipe |
| 16 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Sand avg lead upto 35 kms avg |
| 17 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Sand/stone agg below 40 mm avg lead upto 10 kms avg |
| 18 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Sand/stone agg above 40 mm avg lead upto 10 kms avg |
| 19 | Carriage of material by manual means including loading/unloading and stacking complete from source to site of work Stone avg lead upto 50 meter HL avg Please Enable Macros to View BoQ information |