| 1 | Earth work in excavation of foundation in hard soil or gravelly soil within 50 m initial lead and initial lift, including dressing and levelling the bed etc. complete |
| 2 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. |
| 3 | P.C.C. (1:3:6) using 40 mm & down size b.h.g.c.b chips including watering, curing with cost, direction of Engineer-in-Charge. |
| 4 | B.Plinth beam |
| 5 | D.Lintel & Sill band(G.F) |
| 6 | E.Roof Slab(G.F) |
| 7 | Straightening, Cutting, Bending, binding of M.S rod/TOR steeand tying upthe grills and placing in position incluing cost of binding wire with all cost conveyance , taxes etc completed in all respect as per the direction of Engineer-in-Charge.(GF) |
| 8 | Fly Ash Brick masonry with CM (1:6) in foundation and plinth including watering, curing with cost, conveyance, royalty and taxes of all materials & labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 9 | Fly Ash Brick masonry with CM (1:6) in superstructure including watering, curing with cost, conveyance, royalty and taxes of all materials & labour (T&P) etc. complete as per the direction of Engineer-in-Charge.(G . F) |
| 10 | 12mm thick C.P. (1:6) including watering, curing, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge.(GF) |
| 11 | 16mm thick C.P. (1:6) including watering, curing, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 12 | 20mm thick Grading Plaster (1:4) overroof slabs including watering, curing, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 13 | 20mm thick C.P. in CM(1:6) over the brick masonary(Plinth) including all cost. |
| 14 | 12mm thick cement plaster(1:4) over top of the wall including bitumen painting including cost,conveyance,royality and taxes etc all complete. |
| 15 | Cement Concrete (1:2:4) using 12mm size cbhg chipsl including all cost. |
| 16 | Fixing of vitrified tiles in floors treads or steps and landing on 25mm thick of bed of cement mortar(1:1) jointed with neat cement slury mixed with pigments to match the shades of the tiles including rubbing and polishing complete. |
| 17 | Fixing of vitrified tiles in dados skirting and risers of of steps on 12mm thick cement plaster(1:3) jointed with neat cement slurry mixed wit pigments to match the shades of the tiles including rubbing and polishing complete including cost of tiles. |
| 18 | Fixing of Chequred tiles in floors treads or steps and landing on 25mm thick of bed of cement mortar(1:1) jointed with neat cement slury mixed with pigments to match the shades of the tiles including rubbing and polishing complete. |
| 19 | Fixing of Ceramic floor tiles in floors treads or steps and landing on 25mm thick of bed of cement mortar(1:1) jointed with neat cement slury mixed with pigments to match the shades of the tiles including rubbing and polishing complete. |
| 20 | Fixing of Ceramic wall tiles in dados skirting and risers of of steps on 12mm thick cement plaster(1:3) jointed with neat cement slurry mixed wit pigments to match the shades of the tiles including rubbing and polishing complete including cost of tiles. |
| 21 | Finishing surface of walls with cement based wall putty(water based) of approved make and finished smooth and even surface to receive painting including cost of staging charges with cost of all materials taxes, labour T & P etc complete. |
| 22 | Priming one coat with any approved primer of wall primer . |
| 23 | Wall painting two coats with plastic emulsion paint over a coat of primer including all cost. |
| 24 | Supplying , fitting and fixing of M.S. grills,doors ,windows made out of stuctural steel flat etc. including cost, conveyance, taxes of all materials and labour (T&P) etc. complete as pre direction of engineer in charge |
| 25 | Painting two coats with enamel paint to new MS work over a coat primer including all cost Please Enable Macros to View BoQ information |