|
| 1 | Safe carriage of following materials from Store centre or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of dragging as per site requirement, jumphering of Transformer with 11 KV line through LT ABC cable, Weasal conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. |
| 2 | 09Mtr. STP Pole |
| 3 | 11Mtr. STP Pole |
| 4 | 11 KV D.O. Fuse Set |
| 5 | 11 KV Fuse Set |
| 6 | 11KV TPMO Complete |
| 7 | Stay Set Complete |
| 8 | 11 KV Pin Insulator with Pin |
| 9 | 11 KV Disc Insulator with Fitting 45KN |
| 10 | 11 KV Disc Insulator |
| 11 | 11 KV Disc Fitting |
| 12 | V- Type Cross Arm |
| 13 | Earthing Complete |
| 14 | L.T. PVC Alu. Cable 3.5x240sq.mm. |
| 15 | L.T. PVC Alu. Cable 3.5x70sq.mm. |
| 16 | L.T. XLPE Alu. Cable 3.5x150sq.mm. |
| 17 | L.T. A.B. Cable 3x120sq.mm. |
| 18 | ACSR Dog Conductor |
| 19 | Distribution Box with clamps |
| 20 | Supply, fixing and erection of following materials as per site requirement as per RESPO Norms:- |
| 21 | Top Channel size 125x65x2240 mm. with Clamp, Nut, Bolt & Washers |
| 22 | Dropper Channel size 100x50x2028 mm. with Clamp, Nut, Bolt & Washers |
| 23 | M.S. Angle (T/F Base) |
| 24 | Cross Bracing MS Angle |
| 25 | L.T. Incoming Panel with metering equipment & fixing arrangements |
| 26 | Barbed wire |
| 27 | Stone Pad 300x300x75mm. |
| 28 | Holding clamp with nut & bolt |
| 29 | PG Clamp with nut & bolt |
| 30 | Danger Board with Clamp, Nut & Bolt |
| 31 | Number Plate with Clamp, Nut & Bolt |
| 32 | F-Clamp |
| 33 | Al. Winding wire |
| 34 | Alluminium Paint |
| 35 | Red Oxide Paint |
| 36 | Al. Lug long barrel off-size |
| 37 | ABC Connector 3x120sq.mm. |
| 38 | Dead End Clamp with I-hook |
| 39 | Suspension Clamp with I-hook |
| 40 | Concreting of Stay |
| 41 | Concreting of Support |
| 42 | After dismentling of 25 KVA & 63 KVA Distribution Transformer from old site, safe carriage to the respective site of work including loading & unloading at the respective ends and mounting/placement on double pole/plinth including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual. |
| 43 | After dismentling of 100 KVA & above Distribution Transformer from old site, safe carriage to the respective site of work including loading & unloading at the respective ends and mounting/placement on double pole/plinth including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual. |
| 44 | Earthing for Distibution Transformer installed at various places by digging of pit upto water level depth and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms. |
| 45 | Dismantling and removal of following material from the existing line and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
| 46 | Dismentling of old & used ST Pole |
| 47 | Dismentling of Iron Scrap |
| 48 | Dismentling of Damaged Dog & Weasel Conductor |
| 49 | Dismentling of Damaged L.T. AB Cable Please Enable Macros to View BoQ information |