Name of Work:Providing and Fixing 2 Nos. of Stainless steel gate and weather shade for all floors of Administrative block in thePTU Campus under RUSA fund
Sl. No.
Item Description
1
Laying and Jointing PVC Pipe. Heading
2
NPSR,Providing and fixing stainless steel (grade 304) work made of hollow tubes, channels, plates etc., including welding ,grinding. Buffing, polishing and making curvature (whereever required) and fitting the same with necessary stainless steel nuts and bolts complete. i/c fixing the same with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the RCC members as per the drawing and as per the direction of the Engineer-in charge (the payment for fixing fasteners wil be paid separately,)
3
Code No. 8.8.1.3, Providing and fixing expansion hold fasteners on CC /RCC /Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete - wedge expansion type - Fastener with threaded dia 12 mm
4
21.8.1, Filling the gap in between aluminium frame & adjacent RCC / Brick / Stone work by providing weather silicon sealent over backer rod of approved quality as per architectural drawings and direction complete - Upto 5 mm depth and 5 mm width
5
NPSR Providing and fixing 12 mm thicktoughened glassof approved brand and manufacture , over thess framefixed on the RC fin for rain/ weather shade includingmaking necessary holesandfixing with requiredfittings, all complete as per direction of the Engineer-in-charge
6
Code No.24.2,Providing and fixing double scaffolding system (cup lock type ) on the exterior side of building / structure , upto 25 metre height, above ground level , including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S.tube, placed 1.5 metre centre to centre ,horizontal & vertical tubes joint with cup & lock system with M.S.Tubes, M.S.Tube Challis, M.S. Clamps and staircase system in the scaffolding for working platform etc. and aintaining it in a serviceable condition for execution of work ofcleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required , if feasible , for inspection of work at required locations with essential safety features for the workmen etc., complete as per direction of Engineer-in-chargesNote:(1) The elevational area of the scaffolding shall be measured for payment purpose.(2) The payment will be made once only for execution of all items for such works
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.