| 1 | SCHEDULE OF WORKS |
| 2 | Material and labour for complete removal of existing treatment of old wall and ceiling surfaces and applying two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV Resistance as per IS 15489:2004 Alkali & fungal resistance, dirt resistance exterior paint of required shade and including priming coat of exterior primer applied @ 0.90 litre/10 sqmcomplete all as spcified and directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 3 | M& Labour for providing 2 mm thick wall care putty on old wall surfaces wherever required to make the surface even all as speciifed and as directed(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 4 | M&L preparation of old plastered wall surfaces by brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of distemper oil emulsioncomplete all as specified and directed (Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 5 | M&L preparation of old plastered ceiling surfaces by brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applyingone coat of distemper oil emulsion complete all as specified and directed (Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 6 | M&L Preparation of old CONCRETE surfaces and applying a coat of synthetic enamel paint over 10 cm width or girthcomplete all as specified and as directed. (Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 7 | M & L for painting of old steel surfaces of any description not otherwise described over 10 cm width or girth with onecoats of synthetic enamel paint including preparation of surfaces etc complete all as specified and as directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 8 | M&L Preparation of old wooden surfaces and applying a coat of synthetic enamel paint over 10 cm width or girthcomplete all as specified and as directed. (Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 9 | Taking down cement plastering of any thickness on brick, concrete or stone walls, partitions, ceilings etc including raking out joints, hacking for key, scrubbing down with water etc, removal of rubbish off the premises.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 10 | M&L for 15mm thick rendering on brick or concrete surface in cement mortar 1:4 and finishing the surface with using water proof compoundeven and smooth without using extra cement all as specified and as directed. Note: Water proofing compound shall be measured and paid seperately(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 11 | M&L for 10mm thick rendering on brick or concrete surface in cement mortar 1:6 and finishing the surface with even and smooth without using extra cement all as specified and as directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 12 | M&L for 5mm thick rendering on ceilings in cement mortar 1:3 and finishing the surface with even and smooth without using extra cement all as specified and as directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 13 | Supply only water proofing compoundliquied all as specified |
| 14 | Material and labour for preparation of newly plastered surfaces and applying two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV Resistance as per IS 15489:2004 Alkali & fungal resistance, dirt resistance exterior paint of required shadeover and including priming coat of exterior primer applied @ 0.90 litre/10 sqmover 2 mm thick wall putty complete all as spcified and directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 15 | Preparing the newly plastered surfaces of walls and applying two coat of oil bound distemper over a coat of alkali resistant primer over 2.00mmthick wall are putty completeall as specified and directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 16 | Preparing the newly plastered surfaces of ceilings and applying two coats of oil bound distemper over alkali-resistant primer and 2.00mm thick wall putty complete all as specified and directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 17 | Writing letters or figures (Block. Roman, Italic or Indian) n exc. 30 cm high such as Qtrs NO & Garrage No with white paint in back ground and letters writing should be black paint.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 18 | Taking down steel water tubing 20mm dia bore and connection concealed / fixed on wall under floor and removed from site all as specified and as directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 19 | Refixing GI water tubing surface/concealed, 20mm bore, medium grade galvanized with all fittings (such as tee, elbow, socket, union) and complete all as specified and directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 20 | S&F for GI water tubing surface/concealed, 20mm bore, medium grade galvanized with all fittings (such as tee, elbow, socket, union) and complete all as specified and directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 21 | Taking down steel water tubing 25mm dia bore and connection concealed / fixed on wall under floor and removed from site all as specified and as directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 22 | Refixing GI water tubing surface/concealed, 25mm bore, medium grade galvanized with all fittings (such as tee, elbow, socket, union) and complete all as specified and directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 23 | S&F for GI water tubing surface/concealed, 25mm bore, medium grade galvanized with all fittings (such as tee, elbow, socket, union) and complete all as specified and directed.(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 24 | Uprooting scrubs/plant/flora & fauna on wall girth not exceeding 100mm from brick wall by cutting holes into masonry/walls for digging out roots and dosing Sulfuric/Phenolic Acid as per manufacturer\"s instruction to burn deep rooted tree roots and making good the disturbed area with cement mortar in CM 1:3 using water proofing compound including necessary scaffolding upto a height of 16 metre complete all as specified and directed. |
| 25 | Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., including cleaning for refixing or removal to Store (measured overall as fixed along the centre line over fittings and accessories)(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 26 | Refixing (SWR) PVC pipes 110 mm dia single socketedin any length with solvent cement joints laid under floor or on walls fixed as soil waste/vent pipes complete all as specified and as directed..(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 27 | Refixing (SWR) PVC pipes 75 mm dia single socketedin any length with solvent cement joints laid under floor or on walls fixed as soil waste/vent pipes including taking up or down existing PVC pipes and connections complete all as specified and as directed..(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 28 | S & F (SWR) PVC pipes 110 mm dia single socketedin any length with solvent cement joints laid under floor or on walls fixed as soil waste/vent pipes including taking up or down existing PVC pipes and connections complete all as specified and as directed..(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |
| 29 | S & F (SWR) PVC pipes 75mm dia single socketedin any length with solvent cement joints laid under floor or on walls fixed as soil waste/vent pipes including taking up or down existing PVC pipes and connections complete all as specified and as directed..(Note: The buildings in which repairs are to be carrried out are of 16.00 meter height, necessary cost of scaffolding shall deemed to be included in quoted rate) |