| 1 | Jaipur OA |
| 2 | Rate for excavating trenches upto a depth of 1.65m and back filling the excavated trenches after laying the HDPE / PLB pipe with or without protection as per tender specification.(OFCT) |
| 3 | i) Rate for excavating trenches upto a depth of 165 cms in non rockystrata and back filling the excavated trenches after laying the HDPE / PLB pipe with or without protection as per tender specification. |
| 4 | ii) Rate for excavating trenches upto a depth of 165 cms in soft rock strata and back filling the excavated trenches after laying the HDPE / PLB pipe with or without protection as per tender specification. |
| 5 | iii) Rate for excavating trenches upto a depth of 165 cms inrocky strata and back filling the excavated trenches after laying the HDPE / PLB pipe with or without protection as per tender specification. |
| 6 | Laying of PLB pipe duct through HDD /Manual tunneling /Bucky method at a depth of 2m or more (1HDD) |
| 7 | a) Single PLB pipe. |
| 8 | b)Two to three pipes in bunch |
| 9 | Laying of HDPE / PLB Pipes/Coils, coupled with HDPE/PLB sockets. |
| 10 | Road/Rail crossing through horizontal boring method (manual / Mechanical) and inserting 65/40 dia GI Pipes and pushing ( HDPE / PLB Pipes/Coils inside.(i) Depth shall be 2M and above without GI protection.(ii) Depth is less than 2M with GI Protection as applicable. (Department will supply GI pipes in lengths of approx. 6M, HDPE/PLB pipes/Coils.) |
| 11 | Laying, Jointing , Leveling, fitting and fixingG.I. Pipewith PLB/HDPE pipes/coils in trenches. ( Department will supply G.I. Troughs/GI pipes in lengths of appox. 6M, clamps, HDPE/PLB pipes/Coils) |
| 12 | (a) Laying and fixing of 80 mm/65 mm/40mm G.I. Pipes in trenches with HDPE / PLB Pipes/Coils inside and drawing PP rope. (GIPT) |
| 13 | (b)i) Laying /clamping/fixing of 65 / 40 mm GI Pipe on Bridges and Culverts horizontally / vertically and leading in in BSNL/ Customer premises with laying HDPE / PLB pipes/coils inside, all the material will be supplied by contractor except G.I pipes. (GIBC) |
| 14 | Layingfull round RCC/DWC Pipesall sizesin trenches with HDPE / PLBpipes / coils inside |
| 15 | (a) Full Round RCC pipe |
| 16 | (b) Full Round DWC pipe |
| 17 | LayingSplit RCC Pipes in trenches with HDPE / PLBpipes / coils inside |
| 18 | (a) Split RCC pipe |
| 19 | (b) Split DWC pipe |
| 20 | Providing RCC Protection (1:2:4) at Site to HDPE / PLB or GI Pipes &for item No.1.0 (size 25 cm x 25 cm or as per requirement & instruction of DE OFC/site Engineer). |
| 21 | Weld mesh for reinforcement 50 mm x 100 mm 12 SWG |
| 22 | Earth work in Excavation by mechanical means (Hydraulic excavator)/ manual means not exceeding 1.5 M in width or 10 Sq M on plan), including getting out the excavated soil and disposal of excavated soil as directed with in a lead of 50m and Filling available excavated earth (excluding rock) in trenches/ pits. |
| 23 | Hiring of Hydraulic excavator (3D) with driver and fuel |
| 24 | (i) Opening of Manholes, Blowing of O.F. Cable, Sealing of HDPE / PLB Pipes by Rubber Bushes in Manholes, providing HDPE/RCC/DWCSplit Pipes in manholeand Back Filling of Manholes. |
| 25 | (i) Blowing/Pulling of O.F. Cable through pipe in existing duct / Leading -In in BSNL/customer premises in Jaipur SSA, including cleaning of chocked pipe as per construction specifications.(24F/48F/96F) |
| 26 | ii) Blowing/Pulling of O.F. Cable through pipe in existing duct / Leading -In in BSNL/customer premises in Jaipur SSA, including cleaning of chocked pipe as per construction specifications.(288F) |
| 27 | (a) Jointing/Termination of up to12F OF cable (including fixing of JC). |
| 28 | (b) Jointing/Termination of 24F OF cable (including fixing of JC). |
| 29 | (c) Jointing/Termination of 48F OF cable (including fixing of JC). |
| 30 | (d) Jointing/Termination of 96F OF cable (including fixing of JC). |
| 31 | (e) Jointing/Termination of 288F OF cable (including fixing of JC). |
| 32 | (f) Splicing of per ribbon OF cable (including fixing of JC). |
| 33 | Digging of pit for jointing chamber and construction of brick chamber/Pre cast RCC chamber , filling of brick Chamber with clean sand(Bajri only), supply and placing of pre cast /stone slabs onRCC chmaber / brickchamber, and back filling of jointing pit as per Engineering instructions |
| 34 | Providing, Construction and Fixing of RCC Main holes at site as per construction specification given in the tender document, work includes excavation of pits for the main hole(all material will be arranged by the contractor) |
| 35 | Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixingof route/joint indicator and concreting route/Joint Indicator, Painting and sign writing route/joint indicator. Route indicator shall be supplied |
| 36 | Supply of route indicator( Stone/RCC) , including Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixingof route/joint indicator directly buried i.e. without concreting route/Joint Indicator, Painting and sign writing route/joint indicator. |
| 37 | Digging of pit of size 1.5m x 0.6m up to existing PLB duct depth including bitumen |
| 38 | Colored documentation:3 sets of bound hard copies of documents & one soft copy for each route.Route index diagram profile- (i) Make and size of cable (ii) Offset of cable from center of the road at every 10th meters (iii) Depth profile of cable at every 10th meter. ( iv) Details of protection (v) Location of culverts /bridges with their length and scheme of laying of PLB HDPE Duct thereon (vi) Imporatnt land marks ;location of joints and pulling manholesetclity paper. |
| 39 | Laying of OF Cable in corridor/rises/exchange premises with PLB pipe without GI Pipe (leading in work) |
| 40 | Erection and tightening of overhead cable on existing post/Tree/Any other infrastructure support or de overhead OFC cable and its recovery. (Without Material) |
| 41 | Erection and tightening of overhead cable on existing post/Tree/Any other infrastructure support or de overhead OFC cable and its recovery. ( With Material)-2F/4F/6F only |
| 42 | Cost of recovery of empty OF Cabledrum from the contractor |
| 43 | The Department will supply protection pipes & OF Cable.The contractor shall arrange all other materials required for the work. |
| 44 | Road Restoration work with bituminous macadam for semigrouting 50 mm thick and premix carpet surfacing 25mm thick over the grouted surface (total upto 75 mm thick), including supply of asphalt etc. to evenly match the road, including consolidation and rolling as per standard specification of DSR 1997. |
| 45 | Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm, including supply of concrete to evenly match the road. |